The total work done is 5980 Joules and the power expended is 57 Watts.
<h3>What is work done?</h3>
The work done is the work done in the gravitational field as the bucket is raised up Thus work required to remove the bucket Wb;
Wb = 13.9 kg * 25.9 m * 9.8 m/s^2 = 3530 Joules
Height of the center of mass of chain = 25.9 / 2 = 12.95 m
Work done by the chain Wc;
Wc = 12.95 * 19.3 * 9.8 = 2450 Joules
Total work = 3530 + 2450 = 5980 Joules
Power expended = W / t = 5980 J / 105 sec = 57 J/s = 57 Watts
Learn more about work done:brainly.com/question/13662169
#SPJ1
Answer:
20m/s
Explanation:
acceleration=final velocity-initial velocity/time
4.0m/s²=v m/s-0m/s/5.0sec
5.0sec×4.0m/s²=v m/s-0m/s×5.0m/s/5.0m/s
20m/s=v
<span>Electrons display some properties of waves and while they reside outside of the nucleus, their positions cannot be known with certainty. </span>