Answer:
Dalton
The part of the close-out report that would describe how he would plan and manage projects in the future is:
summary of project management effectiveness
Explanation:
The Project Close-out Report is a project management document, which identifies the variances from the baseline plans. These variances are specified in terms of project performance, project cost, and schedule. The project close-out report records the completion of the project and the subsequent handover of project deliverables to others. The project management effectiveness summary details the project's objectives and the achievements recorded, including the lessons learned.
The total present worth is $19,783.01
The present worth of a series of cash flow is the value of the cash flows in year 0 (today)
Cash flow in year 0 = 5330
Cash flow in year 1 = 0
Cash flow in year 2 = 0
Cash flow in year 3 = 13075 / (1.02)^3 = 12,320.86
Cash flow in year 4 = 2308 / (1.02)^4 = 2,132.24
Present worth = $19,783.01
A similar question was solved here: brainly.com/question/9641711?referrer=searchResults
Answer:
D
Explanation:
the way vertices are connected may be different so having same number of edges do not mean that total degree will also be same.
Answer:
Tech A
Explanation:
The amount of energy required to apply the same force with a 1:1 ratio is divided into 4, so you can apply 4 times as much force than a 1:1 ratio. efficiency and speed come into play here, but assuming the machine powering the gear can run at a unlimited RPM, 4:1 will have more force and a slower output speed than a 2:1 ratio.
Answer:
In the acid processes, deoxidation can take place in the furnaces, leaving a reasonable time for the inclusions to rise into the sla*g and so be removed before casting. Whereas in the basic furnaces, deoxidation is rarely carried out in the presence of the sla*g, otherwise phosphorus would return to the metal.