Answer:
If 2/3 ton of gravel covers 3/4 of a driveway, you need to divide 2/3 divided by 3 to find how much is needed for 1/4 of the driveway. So first step:
1. 2/3 divided by 3 = 2/3 * 1/3. So 2/9.
2. Add 2/3 plus 2/9= 8/9 ton of gravel to cover the whole driveway.
Step-by-step explanation:
Mark me brainliest!
Answer:
draw ka ng teyboll
Step-by-step explanation:
sana maka tulong
Answer:
I think
11cm²-5cm²=121+25
and the square root of that will give you 12.08
and that's the answer
i thank it is B i hope that helped
Answer:
-4/9 is a rational number
Step-by-step explanation:
Rational numbers are the numbers you can make by dividing one integer by another, so in other words a fraction.