Answer:
5 inches tall i think
Step-by-step explanation:
sorry if its wrong
Answer:
Rocket B reaches a maximum height that is greater than the maximum height of Rocket A.
Step-by-step explanation:
A graph quickly shows the answer to this question.
__
In vertex form, the equation for Rocket A is ...
y = -6(x² -16x +8²) +6(8²)
y = -6(x -8)² +384 . . . . . . . . . maximum height is 384 feet
__
The corresponding equation for Rocket B is ...
y = -4(x² -20x +10²) +4(10²)
y = -4(x -10)² +400 . . . . . . . . maximum height is 400 feet
Rocket B reaches a maximum height greater than that of Rocket A.
First, factor out a 3.
3(x² - 9)
In any quadratic ax² + bx + c, we can split the bx term up into two new terms which we want to equal the product of a and c.
In this case, we have x² + 0x - 9. (the 0x is a placeholder)
We want two numbers that add to 0 and multiply to get -9.
Obviously, these numbers are 3 and -3.
Now we have 3(x² + 3x - 3x - 9).
Let's factor.
3(x(x+3)-3(x+3))
<u>3(x-3)(x+3)</u>
There are multiple shortcuts which you could make here, FYI:
Instead of splitting the middle, if your a value is 1, you can go straight to that step (x+number)(x+other number).
Whenever you have a difference of squares, like a²-b², that factors to (a+b)(a-b).
The width is the first numbers.
Width = 225 mm
Aspect ratio is the second number.
Aspect ratio is 45
Aspect ratio is width / height.
You have the ratio and width so you can calculate the height:
Multiply the width by the ratio:
Height = 225 x 0.45 = 101.25 mm
101.25/25.4 = 3.98 inches
The rim
Diameter is the last number
Rim diameter = 17 inches
So the overall height would be approximately 17 + 3.98 + 3.98 = 24.96 inches
Round the answers as needed.
Answer:
12/7 hours
Step-by-step explanation:
First find the rate for hour for the two. For Lianne she can do 1/3 of the job per hour. For Julie she can do 1/4 of the job per hour.
Adding them together, 1/3+1/4= 7/12.
This 7/12 means that working together they can finish 7/12 of a job in an hour. We can use the speed*time=distance formula here and see that
7/12 * time = 1 job done
time = 12/7 hours.