Answer:
4.8ft
Step-by-step explanation:
Answer:
9 - 7x - x²
Step-by-step explanation:
-4x+2x2-x²+5-3x = -4x-3x+2x2+5-x²
I arranged the like terms together so it is easier to do the calculations.
-4x-3x+2x2+5-x² = -7x+4+5-x²
Simplify.
-7x+4+5-x² = 9-7x-x²
Answer:
they must go 12 floors downwards because parking A has to be on the last floor
<span>Defective rate can be expected
to keep an eye on a Poisson distribution. Mean is equal to 800(0.02) = 16,
Variance is 16, and so standard deviation is 4.
X = 800(0.04) = 32, Using normal approximation of the Poisson distribution Z1 =
(32-16)/4 = 4.
P(greater than 4%) = P(Z>4) = 1 – 0.999968 = 0.000032, which implies that
having such a defective rate is extremely unlikely.</span>
<span>If the defective rate in the
random sample is 4 percent then it is very likely that the assembly line
produces more than 2% defective rate now.</span>
Answer:
Step-by-step explanation:
-15 times -5 = 75
-15 + -5 = -20