Answer:
The change in momentum is
Explanation:
From the question we are told that
The mass of the probe is 
The location of the prob at time t = 22.9 s is 
The momentum at time t = 22.9 s is
The net force on the probe is 
Generally the change in momentum is mathematically represented as

The initial time is 22.6 s
The final time is 22.9 s
Substituting values

Answer:
A I think
Explanation:
because what is the most frequency a because it has more frequency I think I'm not that sure
Answer:
F = 75[J]
Explanation:
We know that work is defined as the product of force by distance.
In this way we have two forces, the weight of the block down, and the force that bring about the block to rise.

where:
W = work = 50 [J]
d = distance = 2 [m]
Fweight = 50 [N]
Fupward [N]
Now replacing:
![50=-(50*2)+(F_{upward}*2)\\50+100=F_{upward}*2\\F_{upward}=150/2\\F_{upward}=75[J]](https://tex.z-dn.net/?f=50%3D-%2850%2A2%29%2B%28F_%7Bupward%7D%2A2%29%5C%5C50%2B100%3DF_%7Bupward%7D%2A2%5C%5CF_%7Bupward%7D%3D150%2F2%5C%5CF_%7Bupward%7D%3D75%5BJ%5D)
The work done when a spring is stretched from 0 to 40cm is 4J.
What is work done?
Work done is the magnitude of force multiplied by displacement of an object. It is also the amount of energy transferred to an object when work is done on that.
The work done on the spring to stretch to 40cm is,
F = kx
where F is force, k is force constant.
k = F / x = 10 N / 20 * 10^-2 m = 50 N/m
W = 0.5 * k * (x)^2
where W = work done, k = force constant.
W = 0.5 x 50 x (40 x 10^-2)^2 = 4 J.
Therefore, the work done on the spring when it is stretched to 40cm is 4J.
To learn more about work done click on the given link brainly.com/question/25573309
#SPJ4
Answer:
I think the answer will be water ,sorry if ik wrong