There are several information's of immense importance already given in the question. Based on the given information's the answer to the question can easily be determined.
Distance covered by the bicycle = 5000 meter
Time taken by the bicycle to reach the distance = 500 second.
Velocity of the bicycle = Distance / Time taken
= 5000/500 meter/second
= 50 meter/second
So the velocity of the bicycle is 50 meter per second. I hope the procedure is clear enough for you to understand. In future you can always use this procedure for solving similar problems.
True if you actually did it. false if you didn't
All agents of erosion all move and separate rock and dirt?
To solve this problem we will apply the linear motion kinematic equations, and force related equations in Newton's second Law.
Our values are given by:




Through equilibrium we know that the Force coming from the vertical weight component minus the Force exerted on the body must be equal to the total Force (Mass and acceleration). So,

Applying the kinematic equations of motion in which the velocity is described by the change in acceleration and position we have



Therefore the Speed at the bottom is 3.44m/s