Answer:
an expression of more than two algebraic terms, especially the sum of several terms that contain different powers of the same variable(s).
Answer:
I₂ = 2.13 x 10⁻⁸ W/m²
Explanation:
given,
increase in sound level = 28.1 dB
frequency of the sound = 250 Hz
intensity = 3.3 x 10⁻¹¹ W/m²
Intensity delivered = ?
the difference of intensity level is give as






I₂ = 645.65 I₁
I₂ = 645.65 x 3.3 x 10⁻¹¹
I₂ = 2.13 x 10⁻⁸ W/m²
<span>373.2 km
The formula for velocity at any point within an orbit is
v = sqrt(mu(2/r - 1/a))
where
v = velocity
mu = standard gravitational parameter (GM)
r = radius satellite currently at
a = semi-major axis
Since the orbit is assumed to be circular, the equation is simplified to
v = sqrt(mu/r)
The value of mu for earth is
3.986004419 Ă— 10^14 m^3/s^2
Now we need to figure out how many seconds one orbit of the space station takes. So
86400 / 15.65 = 5520.767 seconds
And the distance the space station travels is 2 pi r, and since velocity is distance divided by time, we get the following as the station's velocity
2 pi r / 5520.767
Finally, combining all that gets us the following equality
v = 2 pi r / 5520.767
v = sqrt(mu/r)
mu = 3.986004419 Ă— 10^14 m^3/s^2
2 pi r / 5520.767 s = sqrt(3.986004419 * 10^14 m^3/s^2 / r)
Square both sides
1.29527 * 10^-6 r^2 s^2 = 3.986004419 * 10^14 m^3/s^2 / r
Multiply both sides by r
1.29527 * 10^-6 r^3 s^2 = 3.986004419 * 10^14 m^3/s^2
Divide both sides by 1.29527 * 10^-6 s^2
r^3 = 3.0773498781296 * 10^20 m^3
Take the cube root of both sides
r = 6751375.945 m
Since we actually want how far from the surface of the earth the space station is, we now subtract the radius of the earth from the radius of the orbit. For this problem, I'll be using the equatorial radius. So
6751375.945 m - 6378137.0 m = 373238.945 m
Converting to kilometers and rounding to 4 significant figures gives
373.2 km</span>
Answer:
Hello, the tripping of a 230-kilovolt transmission line.
Explanation:
the tripping of a 230-kilovolt transmission line near Ontario, Canada, at 5:16 p.m., which caused several other heavily loaded lines also to fail. Hopefully this helps you find what your looking for!.
B) The amount of work done