Question: A loader sack of total mass
is l000 grams falls down from
the floor of a lorry 200 cm high
Calculate the workdone by the
gravity of the load.
Answer:
19.6 Joules
Explanation:
Applying
W = mgh........................ Equation 1
Where W = Workdone by gravity on the load, m = mass of the loader sack, h = height, g = acceleration due to gravity
From the question,
Given: m = 1000 grams = (1000/1000) kilogram = 1 kg, h = 200 cm = 2 m
Constant: g = 9.8 m/s²
Substitute these values into equation 1
W = (1×2×9.8)
W = 19.6 Joules
Hence the work done by gravity on the load is 19.6 Joules
<span>79.75m/s .................................</span>
Answer:
Part a)

Part b)

Part c)

Explanation:
Part a)
As we know that ball will reach at maximum height at
t = 3 s
now we will have

now we have


Now maximum height above ground is given as



Part b)
Height of the fence is given as



Part c)
As we know that its horizontal distance moved by the ball in 5.5 s is given as



now total time of flight is given as

so range is given as



so the distance from the fence is given as

