Answer:
let, the days for 10 men be x
- 30/10=x/30
- 900=10x
- x=900/10
- x=90
so 10 men can complete the same work in 90days.
Hope it helps.
The answer for this one is 29 and 13. Hope it help!
Answer:
-4, 0, and 4
Step-by-step explanation:
Answer:
x = 41.67
Step-by-step explanation:
The above equation, would be simplified or divided into parts;
Therefore, the given equation becomes;
A/x = B/C
Where;
A = (15.2*0.25-48.51/14.7)
B = (13/44-2/11-5/66/2.50)1.2
C = 3.2+0.8(5.5-3.25)
x = unknown variable.
<u>Part A</u>
(15.2*0.25-48.51/14.7) = (15.2*0.25 - 3.3)
A = (3.8 - 3.3)
A = 0.5
<u>Part B</u>
(13/44-2/11-5/66/2.50)1.2 = (0.3 - 0.18 - 0.030) * 1.2
B = 0.09 * 1.2
B = 0.108
<u>Part C</u>
(3.2+0.8(5.5-3.25)
C = 4*(2.25)
C = 9
<em>Substituting the values into the equation, we have;</em>
0.5/x = 0.108/9
<em>Cross-multiplying, we have;</em>
9 * 0.5 = 0.108x
4.5 = 0.108x
x = 4.5/0.108
x = 41.67