Answer:
11200 for 7 engines for a total of 80 hours
Step-by-step explanation:
You have 8 engines burning 12000 .for 10 hours.
Divide 10 hours into 12000=1200 PER hour.
1200 ÷8 engines = 140 per hour per engine.
140 × # of hours (12)=1680 for 12 hours per engine.
# of engines × 1680 for 12 hour/per engine
5×1680 = 8400 of fuel for 12 hours/5 engine
Then you have 2 that runs 10 hours
2 × 140 per hour per engine =280 × 10 =2800 for 2 engines for 10 hours
8400. + 2800= 11200 of fuel for 6 engines
Your question does not say what were your options, therefore I will answer generically: in order to understand if a point (ordered pair) is contained in a line, you need to substitute the x-component of the pair in the equation of the line and see if the calculations give you the y-component of the pair.
Example:
Your line is <span> y = 4/3x + 1/3
Let's see if <span>(0, 0) and (2, 3) </span>belong to this line
y</span> = <span>4/3·0 + 1/3 = 1/3 </span>≠ 0
Therefore, the line does not contain (0, 0)
y = 4/3·2 + 1/3 = 9/3 = 3
Therefore, the line contains (2, 3)
Answer:
Step-by-step explanation:
2.7*4=10.80
27*0.4=10.80 we multiplied 27 by 10 but divide 4 by 10
0.27*40=10.80
in STR,
ST=SR
therefore, t=r(angles opposite equal sides of a triangle are equal)
T=73
C+73+73=180(ASP of triangle)
C=34