Answer:
(a) work required to lift the object is 1029 J
(b) the gravitational potential energy gained by this object is 1029 J
Explanation:
Given;
mass of the object, m = 35 kg
height through which the object was lifted, h = 3 m
(a) work required to lift the object
W = F x d
W = (mg) x h
W = 35 x 9.8 x 3
W = 1029 J
(b) the gravitational potential energy gained by this object is calculated as;
ΔP.E = Pf - Pi
where;
Pi is the initial gravitational potential energy, at initial height (hi = 0)
ΔP.E = (35 x 9.8 x 3) - (35 x 9.8 x 0)
ΔP.E = 1029 J
Answer:
Average velocity

Average speed,

Explanation:
(a)Average velocity
We have to find the average velocity. We know that velocity is defined as the rate of change of displacement with respect to time.
To find the average velocity we have to find the total displacement.
since displacement along east direction is 50m
and displacement along west=40m
so total displacement,

total time,

therefore, average velocity

(b)Average Speed:
Average speed is defined as the ratio of total distance to the total time
it means
Average speed= total distance/total time
here total distance,

and total time,

therefore,
Average speed,

decrease yeah free 100 percent