Answer: I would help you but I don’t know the answer, so sorry
Explanation:
≈4.8
There really isn't an elegant way to express it. Just plug and chug for irrationals raised to other irrationals.
Did not engineer cables factoring wind shear
So I’m thinking C because they both have a lot to do with design here is my evidence. Structural engineering is a component of civil engineering which focuses on the design and development of infrastructures such as bridges, skyscrapers, dams. Civil engineering is a professional engineering discipline that deals with the design, construction, and maintenance of the physical and naturally built environment. I may be wrong but hope this helped!
Answer:
a) 28 stations
b) Rp = 21.43
E = 0.5
Explanation:
Given:
Average downtime per occurrence = 5.0 min
Probability that leads to downtime, d= 0.01
Total work time, Tc = 39.2 min
a) For the optimum number of stations on the line that will maximize production rate.
Maximizing Rp =minimizing Tp
Tp = Tc + Ftd
At minimum pt. = 0, we have:
dTp/dn = 0
Solving for n²:
The optimum number of stations on the line that will maximize production rate is 28 stations.
b)
Tp = 1.4 +1.4 = 2.8
The production rate, Rp =
The proportion uptime,