Answer:
The work done by Joel is greater than the work done by Jerry.
Explanation:
Let suppose that forces are parallel or antiparallel to the direction of motion. Given that Joel and Jerry exert constant forces on the object, the definition of work can be simplified as:

Where:
- Work, measured in joules.
- Force exerted on the object, measured in newtons.
- Travelled distance by the object, measured in meters.
During the first 10 minutes, the net work exerted on the object is zero. That is:





In exchange, the net work in the next 5 minutes is the work done by Joel on the object:


Hence, the work done by Joel is greater than the work done by Jerry.
-- Although it's not explicitly stated in the question,we have to assume that
the surface is frictionless. I guess that's what "smooth" means.
-- The total mass of both blocks is (1.5 + 0.93) = 2.43 kg. Since they're
connected to each other (by the string), 2.43 kg is the mass you're pulling.
-- Your force is 6.4 N.
Acceleration = (force)/(mass) = 6.4/2.43 m/s²<em>
</em> That's about <em>2.634 m/s²</em> <em>
</em>(I'm going to keep the fraction form handy, because the acceleration has to be
used for the next part of the question, so we'll need it as accurate as possible.)
-- Both blocks accelerate at the same rate. So the force on the rear block (m₂) is
Force = (mass) x (acceleration) = (0.93) x (6.4/2.43) = <em>2.45 N</em>.
That's the force that's accelerating the little block, so that must be the tension
in the string.
R=U/I so
U=RxI
U= 10 x 42
U= 420 volts
Answer:
linear density of the string = 4.46 × 10⁻⁴ kg/m
Explanation:
given,
mass of the string = 31.2 g
length of string = 0.7 m
linear density of the string = 
linear density of the string = 
linear density of the string = 44.57 × 10⁻³ kg/m
linear density of the string = 4.46 × 10⁻⁴ kg/m
Answer:
The energy flows between the ice and the tea equally. The table below shows the temperatures of several different objects made of the same material.