Answer:
Energy. They need energy.
Explanation:
Answer:
a = 3.27 m/s²
v = 2.56 m/s
Explanation:
given,
mass A = 1 kg
mass B = 2 kg
vertical distance between them = 1 m










a = 3.27 m/s²
The speed of the system at that moment is:
v² = u² + 2×a×s
v² = 0² + 2× 3.27 × 1
v ² = 6.54
v = 2.56 m/s
Answer:
2156 J
Explanation:
From the question,
Work done = Combined mass of the bucket and water×height×gravity.
W = (M+m)hg............................. Equation 1
Where M = mass of water, m = mass of the bucket, h = height, g = acceleration due to gravity.
Given: M = 20 kg, m = 2 kg, h = 10 m
Constant: g = 9.8 m/s²
Substitute these value into equation 1
W = (20+2)×10×9.8
W = 22×98
W = 2156 J
It is durable because it is one of the strongest metals and doesn't corrode easily.
Answer:
Sam will do 1152 J of work to stop the boat
Explanation:
Work: This is defined as the product of force and distance, the S.I unit of work is Joules. At any point in science, during calculation Energy and worked can be interchange because they have the same unit.
E = W = 1/2mv²................ Equation 1
Where E = energy, W = work, m = mass, v = velocity.
Given: m = 900 kg, v = 1.6 m/s
Substituting these values into equation 1
W = 1/2(900)(1.6)²
W = 450×2.56
W = 1152 J.
Therefore Sam will do 1152 J of work to stop the boat