Designing systems for manufacturing, motion analysis or impact testing;
building and testing prototypes;
analyzing the human body to prevent injury;
developing or designing new light weight materials that will be more comfortable and withstand greater impacts or forces;
Answer:
Light = A xor B
Explanation:
If switches A and B produce True or False, then Light will be True for ...
Light = A xor B
Answer:
The source code files for this question have been attached to this response.
Please download it and go through each of the class files.
The codes contain explanatory comments explaining important segments of the codes, kindly go through these comments.
<span class="sg-text sg-text--link sg-text--bold sg-text--link-disabled sg-text--blue-dark">
java
</span>
<span class="sg-text sg-text--link sg-text--bold sg-text--link-disabled sg-text--blue-dark">
java
</span>
<span class="sg-text sg-text--link sg-text--bold sg-text--link-disabled sg-text--blue-dark">
java
</span>
<span class="sg-text sg-text--link sg-text--bold sg-text--link-disabled sg-text--blue-dark">
java
</span>
<span class="sg-text sg-text--link sg-text--bold sg-text--link-disabled sg-text--blue-dark">
java
</span>
Answer:
Explanation:
The Turnaround time is the amount of time that elapses between the job arriving and completing. We assume that all jobs arrive at time 0, the turnaround time will simply be the time that they complete.
Round Robin:
we assume that the time quantum of the scheduler is 1 second.The table below gives a break down of which jobs will be processed during each time quantum. A asterisk(*) indicates that the job completes during that quantum.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
A B C D E A B C* D E A B D E A B D* E A B E A B* E A E A E* A A
C* = 8
D*=17
B*=23
E*=28
AVERAGE TURNAROUND = (8+17+23+28+30)/5 =106/5 = 21.2 MINUTES
B) PRIORITY SCHEDULING:
1-6 7-14 15-24 25-26 27-30
B E A C D
AVERAGETURNAROUND =(6+14+24+26+30)/5 = 100/5 = 20 MINUTES.
C)FCFS
1-10 11-16 17-18 19-22 23-30
A B C D E
AVERAGE TURNAROUND =(10+16+18+22+30)/5 = 96/5=19.2 MINTUES
D)SJF
1-2 3-6 7-12 13-20 21-30
C D B E A
AVERAGE TURNAROUND - (2+6+12+20+30)/5 =70/5 =14 MINUTES.