Answer:
planning charts used to schedule resources and allocate time is the correct answer
Explanation:
- Gantt Charts are a project planning tool used to track the projects from the start to endpoint.
- Gantt charts are used for the preparation and planning of the projects.
- By using Gantt charts we can assess how much time a project would take to complete and we can also determine resources required with the help of Gantt charts.
Answer:
1.5 unit of product per min
Explanation:
30 units of product was moved in 30 minutes.
Number of units left = Total number of units-number of units moved
=75-30 =45 units
45 units is available to be moved for the rest 30 min. To be able to achieve this goal of 75 units of product per hour.
45/30 amount of units must be moved in 1 min
=1.5 unit per min
For both NPN and PNP this is true:
The base is between the collector and the emitter.
Answer:
Explanation:
Using the atomic mass of pluonium atoms (244 g/mol), you can calculate the number of atoms in 47.0 g. Then, knowing that each plutonium atom has 96 protons, you calculate the number of protons in the 47.0 g sample. Finally, using the positive charge of one proton, you calculate the total positive charge in the 47.0 g of plutonium.
<u>1. Number of atoms of plutonium in 47.0 g</u>
- Number of moles = mass / atomic mass = 47.0 g / 244 = 0.1926 moles
- Number of atoms = number of moles × 6.022 × 10²³ atoms/mol
- Number of atoms = 0.1926 mol × 6.022 × 10²³ atoms/mol = 1.15998×10²³ atoms
<u>2. Number of protons</u>
- Number of protons = 1.15998×10²³ atoms × 96 protons/atom = 1.11385×10²⁵ protons
<u>3. Charge</u>
<u />
- Charge = charge of one proton × number of protons
- Charge = 1.602×10⁻¹⁹ C/proton × 1.11385×10²⁵ protons = 1.78×10⁶C