Answer
1056
Explanation:
for example
A soil is to be excavated from a borrow pit which has a density of 1.75g/cc and water content of 12%. The G is 2.7 the soil is compacted to that water content of 18% and dry density of 1.65g/cc. for 1000 m3 of soil used in fill estimate
Quantity of soil to be excavated from pit in m3
Answer:
••• like a story pole but has information for only one portion of the wall. system. methods and materials of construction.
Answer:
The database has three tables for tracking horse-riding lessons: Horse with columns: ID - primary key; RegisteredName; Breed; Height; BirthDate.
Explanation:
Answer:
Explanation:
There are a total of 6 states and 3 bits in this problem. Whenever the Reset button is pressed, RESET state is called otherwise the state according to the diagram is called. For the combination to be "01011", the input sequence has to be in the same order. If 0 is pressed instead of 1 in state "010", the last state of output ending with 0 will be called and likewise in all the states that follow.
Answer: Create lessons learned at the end of the project.
Explanation:
Lessons learned are the experiences that are gotten from a project which should be taken into account for the future projects. Lesson learned are created at the end of the project.
The main objective of the lessons learned is that they show both the positive experience and the negative experience of a project and this will help the future projects that will be undertaken.