Answer:
Check the explanation
Explanation:
Kindly check the attached images below to see the step by step explanation to the question above.
Answer:
The part of the system that is considered the resistance force is;
B
Explanation:
The simple machine is a system of pulley that has two pulleys
The effort, which is the input force at A gives the value of the tension at C and D which are used to lift the load B
Therefore, we have;
A = C = D
B = C + D = C + C = 2·C
∴ C = B/2
We have;
C = B/2 = A
Therefore, with the pulley only a force, A equivalent to half the weight, B, of the load is required to lift the load, B
The resistance force is the constant force in the system that that requires an input force to overcome in order for work to be done
It is the force acting to oppose the sum of the other forces system, such as a force acting in opposition to an input force
Therefore, the resistance force is the load force, B, for which the input force, A, is required in order for the load to be lifted.
Batter boards (or battre boards, Sometimes mispronounced as "battle boads") are temporary frames, set beyond the corners of a planned foundation at precise elevations. These batter boards are then used to hold layout lines (construction twine) to indicate the limits (edges and corners) of the foundation.
Answer:
b
Explanation:
the NEC has expanded the requirements for ground-fault circuit interrupters (GFCI) to protect anyone who plugs into an electrical system. Initially, it was only required for temporary wiring at construction sites and in dwelling unit bathrooms, but in recent years the Code requirements for GFCI protection have expanded to include many other areas, including commercial occupancies, fountains and swimming pools, and temporary installations, to name a few. (For a complete list of 2002 NEC references, see the sidebar below)
Answer:
Explanation:using the product immediately in the next step