Answer:fan blades, rotating , abrasive wheel machinery
Explanation:
Acid mine drainage is the formation and movement of highly acidic water rich in heavy metals. This acidic water forms through the chemical reaction of surface water (rainwater, snowmelt, pond water) and shallow subsurface water with rocks that contain sulfur-bearing minerals, resulting in sulfuric acid.
Answer:
Considering the guidelines of this exercise.
The pieces produced per month are 504 000
The productivity ratio is 75%
Explanation:
To understand this answer we need to analyze the problem. First of all, we can only produce 2 batches of production by the press because we require 3 hours to set it up. So if we rest those 6 hours from the 8 of the shift we get 6, leaving 2 for an incomplete bath. So multiplying 2 batches per day of production by press we obtain 40 batches per day. So, considering we work in this factory for 21 days per month well that makes 40 x 21 making 840 then we multiply the batches for the pieces 840 x 600 obtaining 504000 pieces produced per month. To obtain the productivity ratio we need to divide the standard labor hours meaning 6 by the amount of time worked meaning 8. Obtaining 75% efficiency.
Answer:
Check the explanation
Explanation:
A vending machine controller is that type of machine that comes with a single serial port on the same chip as the programmable processor. The controller comprises of a port arbitrator that selectively attaches or links one of a number of serially communicating devices to this single serial port.
Kindly check the attached image to get the step by step explanation to the above question.
Seeing what the other side of the world is doing right now