e. design programming
Explanation:
The planning techniques are responsible for structuring the tasks to be performed within the project, defining the duration and the order of execution of the same, while the programming techniques try to organize the activities so that the logical temporal relationships between them, determining the calendar or the moments of time in which each one must be realized. The programming must be consistent with the objectives pursued and respect existing restrictions (resources, costs, workloads).
The programming therefore consists in setting, in an approximate way, the moments of beginning and termination of each activity. Some activities may have slack and others are critical activities (fixed over time).
STEPS:
Build a time diagram (moments of beginning and slack of activities).
Establish the times of each activity.
Analyze project costs and adjust clearances (minimum cost project).
Answer:
And the same can be said of a pendulum vibrating about a fixed position or of a guitar ... along the time axis, it is possible to determine the time for one complete cycle. ... It takes 2.3 seconds to complete the first full cycle of vibration. ... Since the standard metric unit of time is the second, frequency has units of cycles/second.
Explanation:
Plz mark brainliest im only 12. and i have never been marked brainliest.
Answer:
11300 kgm3
Hope this helps
Answer:Density is the mass of an object divided by its volume. Density often has units of grams per cubic centimeter (g/cm3). ... You probably have an intuitive feeling for density in the materials you use often. For example, sponges are low in density; they have a low mass per unit volume.
Explanation: