1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Luda [366]
3 years ago
15

____ technologies are new technologies that are not currently widely employed.

Engineering
2 answers:
otez555 [7]3 years ago
8 0
C emerging bc they’re still being made
777dan777 [17]3 years ago
5 0

Answer:

I believe the answer is Emerging

Explanation:

BEcause Emerging is not quite being used as much publicaly and there really new

You might be interested in
vertical gate in an irrigation canal holds back 12.2 m of water. Find the average force on the gate if its width is 3.60 m. Repo
DanielleElmas [232]

Answer:

The right solution is "2625 kN".

Explanation:

According to the question,

The average pressure will be:

= density\times g\times \frac{h}{2}

By putting values, we get

= 1000\times 9.8\times \frac{12.2}{2}

= 1000\times 9.8\times 6.1

= 59780

hence,

The average force will be:

= Pressure\times Area

= 59780\times 3.6\times 12.2

= 2625537 \ N

Or,

= 2625 \ kN

5 0
3 years ago
What are the general rules for press fit allowances
Keith_Richards [23]

Explanation:

As a general rule of thumb, the large the diameter of a bearing, bushing or pin, the larger the tolerance range,” Brieschke points out. “The inverse is true for smaller-diameter pieces.”

Mike Brieschke, vice president of sales at Aries Engineering, says a 0.25-inch-diameter metal dowel that is press-fit into a mild steel hole usually has an interference of ±0.0015 inch. Parts in noncritical assemblies tend to have looser tolerances

please rate brainliest if helps and follow

4 0
1 year ago
Assign deliveryCost with the cost (in dollars) to deliver a piece of baggage weighing baggageWeight. The baggage delivery servic
Sholpan [36]

Answer: y = x * 1dollars - 30dollars

Explanation:

Giving that the delivery cost in dollar is potent for all x > = 50 pounds of wght

Y = (x - 50)*1 dollar + c ...equ 1

Y = delivery cost equation in dollars

x = weigt of baggage for delivery

c = 20dollars = down payment for the first 50 pound weight of baggage

Equ 1 becomes

Y = (x)dollars - 50 dollars + 20 dollars

Y = (x) dollars -30 dollars

4 0
4 years ago
An airline ticket counter forecasts that 220 people per hour will need to check in. It takes an average of 2 minutes to service
Nadusha1986 [10]

A) Number of agents required to achieve a wait time of 10 minutes or less = 8 agents

B) The number of agents required on duty to reduce cost = 9 agents

<u>Given data : </u>

Arrival rate of customers ( β ) = 220 per hour

Service rate ( mu ) = 60 minutes / 2 minutes = 30 customer per hour

utilization ( rho ) = 220 / 30 ≈ 7

at least 8 server personnel are required for stability of the queue

A<u>) Determine the number of agents required to achieve a wait time of 10 minutes or less per customer</u>

waiting time = 10 - 2 = 8 minutes

number of customers waiting ( ∝ ) = 7 and required server = 8

assuming   Lq = 5.2266

Hence the waiting time in line = Lq / arrival rate

                                                  = 5.2266 / 220 = 0.0238 hour

                                                  = 0.0238 * 60 = 1.428 minutes

Since the waiting time ( 1.428 minutes ) is less than the original waiting time ( 2 minutes ) the number of agents that will achieve a wait time of 10 minutes or less is = 8 agents

<u>B) Determine the number of</u><u> ticket agents</u><u> that should be on duty to minimize cost </u>

salary of ticket agent = £12 per hour

cost of customer waiting in queue = £5 per hour per customer

<em> </em><u>i) When 8 agents are used </u>

waiting time of customers = 0.0238 * 220 = 5.236

waiting cost for customers = 5.236 * 5 = £26.18

employee cost = 8 * 12 = £96

∴ Total cost = 96 + 26.18

                    = £ 122.18

<u>ii) When 9 agents are used </u>

waiting time for customers = 0.0074 * 220 = 1.628

Wq = 1.6367 / 220 = 0.0074

waiting cost for customers = 1.6367 * 5 = £ 8.1835

assuming Lq = 1.6367

employee cost = 9 * 12 = £ 108

∴ Total cost = 108 + 8.1835 = £ 116.18

From the calculations in ( i ) and ( ii ) the Ideal number of ticket agents that should be on duty to minimize cost should be 9 agents.

Hence we can conclude that A) Number of agents required to achieve a wait time of 10 minutes or less = 8 agents and The number of agents required on duty to reduce cost = 9 agents.

Learn more about cost reduction : brainly.com/question/14115944

6 0
3 years ago
Which of the following hazards is shared by surface mining and sub-surface mining?
lubasha [3.4K]

B I guess. since they both have potential to collapse

4 0
3 years ago
Read 2 more answers
Other questions:
  • A solid circular rod that is 600 mm long and 20 mm in diameter is subjected to an axial force of P = 50 kN The elongation of the
    11·1 answer
  • What is the differences between stack and queue?
    11·1 answer
  • What type of fuel does a 2 cycle engine use
    5·1 answer
  • 25 points and brainliest is it A, B, C, D
    5·2 answers
  • I have a question for you guys
    13·2 answers
  • Which component found in fertilizer is a known cancer-causing agent?
    11·2 answers
  • What are some common work contexts for Licensing Examiners and Inspectors? Select four options.
    12·2 answers
  • Engineers designed a motorcycle helmet from a long-lasting and safe material that protects the wearer from accidents and excessi
    7·1 answer
  • To put out a class D metal fire, you must _______ the fire.
    13·1 answer
  • Find At Least Three Instances Of Set Constructions In Your CS Courses And Use Them To Exhibit All Set Operations Discussed In Cl
    11·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!