Answer:

Explanation:
speed of motor (N)=1500 rpm
power=4 hp =
=2.9828 KW
service factor(k)= 2.75
now,


torque rating

Answer:
a mass of water required is mw= 1273.26 gr = 1.27376 Kg
Explanation:
Assuming that the steam also gives out latent heat, the heat provided should be same for cooling the hot water than cooling the steam and condense it completely:
Q = mw * cw * ΔTw = ms * cs * ΔTw + ms * L
where m = mass , c= specific heat , ΔT=temperature change, L = latent heat of condensation
therefore
mw = ( ms * cs * ΔTw + ms * L )/ (cw * ΔTw )
replacing values
mw = [182g * 2.078 J/g°C*(118°C-100°C) + 118 g * 2260 J/g ] /[4.187 J/g°C * (90.7°C-39.4°C)] = 1273.26 gr = 1.27376 Kg
Answer:
a) 
b) 
Explanation:
From the question we are told that:
Cast-iron block Dimension:
Length
Width 
Feed
Depth 
Diameter 
Number of cutting teeth 
Rotation speed 
Generally the equation for Approach is mathematically given by



Therefore
Effective length is given as



a)
Generally the equation for Machine Time is mathematically given by

Where



Therefore


b)
Generally the equation for Material Removal Rate. is mathematically given by



Answer:
189.15cy
Explanation:
To understand this problem we need to understand as well the form.
It is clear that there is four wall, two short and two long.
The two long are 
The two long are 
The two shors are 
The height and the thickness are 14ft and 0.83ft respectively.
So we only calculate the Quantity of concrete,
![Q_c = [(2*122.08)+(2*86-375)]*14*0.833\\Q_c=4864.02ft^3](https://tex.z-dn.net/?f=Q_c%20%3D%20%5B%282%2A122.08%29%2B%282%2A86-375%29%5D%2A14%2A0.833%5C%5CQ_c%3D4864.02ft%5E3)
That in cubic yards is equal to 
Hence, we need order 5% plus that represent with the quantity

Answer:
Explanation:
Work, U, is equal to the force times the distance:
U = F · r
Force needed to lift the weight, is equal to the weight: F = W = m · g
so:
U = m · g · r
= 20.4kg · 9.81
· 1.50m
= 35.316 
= 35.316 W