1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
saw5 [17]
3 years ago
9

List 3 types of heat exchangers, and classify them?

Engineering
1 answer:
frez [133]3 years ago
3 0

Answer:

Concentric tubes or double tube.

Casing and tubes.

Plates.

Explanation:

There are two classify of heat exchange:

1) Direct contact heat exchanger: the exchange heat is produced by the mixture betweenn two fluids, for example refrigeration towers.

2) Indirect contact heat exchange: the fluids never mix, and exchange the heat across a surface.

For example:

Concentric tubes or double tube: the fluid travel trough the central tube, and in the extern tube (bigger diameter) have other fluir with a different tempreature which can give o became the heat of the central fluid.

Casing and tubes are used in Industries, which have a lot of tube inside tha casing.

Plates: the fluid travel throug the metal plates.

You might be interested in
3. Assuming a 6V battery to power an LED. The current limiting resistor is 195 ohms. Using the standard maximum current of the c
Dominik [7]

Do you know anything about a Hummingbird kit and know how to code it?

3 0
3 years ago
What are the main factors for the high material removal rate in broaching operations?
Umnica [9.8K]

Answer:

Explanation:

Broaching:

  Broaching is a metal removal process or we can say that it is a machining process.Generally broach have three types teeth in which first one is called roughing teeth,second one semi finishing and third  one finishing teeth.By using these teeth metal remove so fast and that is why broaching is the high metal removal rate operation.

6 0
3 years ago
The rolling process is governed by the frictional force between the rollers and the workpiece. The frictional force at the entra
adell [148]

Answer:

b)false

Explanation:

Rolling is a process in which work piece passes through rolls to produce desired out put of the work piece.Rolling  is a metal forming process.

We know that friction force is responsible for motion of work piece between rolls.If friction force is so small at the entrance side then work piece will not enter in the forming zone and forming process will not occurs.So the friction force should be high at the entrance side and low at the exit side.

So given statement is wrong.

3 0
3 years ago
Find the total amount of heat in Q lost through a wall 10' by 18' , with R value from q. 1. Inside temperature is 70 degrees F w
marissa [1.9K]

Answer:

Just think

Explanation:

6 0
4 years ago
Read 2 more answers
BAGAIMANA CARA MENINGKATKAN PRODUKTIVITAS ? APA SAJA VARIABEL
morpeh [17]

Answer:

;-;

Explanation:

am i dyslexic or is this another language

5 0
3 years ago
Read 2 more answers
Other questions:
  • A well-insulated, rigid tank, having a volume of 2 m3 , contains saturated water vapor at 120 ◦C. The water is stirred until the
    13·1 answer
  • A computer has a two-level cache. Suppose that 60% of the memory references hit on the first level cache, 35% hit on the second
    12·1 answer
  • The hot and cold inlet temperatures to a concentric tube heat exchanger are Th,i = 200°C, Tc,i = 100°C, respectively. The outlet
    10·1 answer
  • Tech A says that thrust angle refers to the direction the front wheels are pointing. Tech B says that scrub radius refers to the
    8·1 answer
  • In the equivalent rectangular concrete stress distribution, the distance from the fiber of maximum strain to the neutral axis sh
    12·1 answer
  • Resistors of 150 Ω and 100 Ω are connected in parallel. What is their equivalent resistance?
    13·1 answer
  • . H<br> Kijwhayhwbbwyhwbwbwgwwgbwbwhwh
    6·2 answers
  • On a supply and demand graph, equilibrium is the point where
    8·1 answer
  • there are 17 toinspect in a commercial building. Each inspection takes 40 min. How many will the full inspection take
    9·1 answer
  • Visual perception is a mental process that is non selective<br> True<br> False
    14·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!