1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
nevsk [136]
3 years ago
10

Which reference source may be consulted to answer questions regarding the Professional Engineers Act?

Engineering
1 answer:
9966 [12]3 years ago
6 0

Answer: c. The Professional Engineers Act and Board Rules

Explanation:

The reference source may be consulted to answer questions regarding the Professional Engineers Act is the The Professional Engineers Act and Board Rules.

The Professional Engineers Act and Board Rules is an Act that was established in order to regulate the qualifications for professional engineered, register them and also make sure that their conducts and behavior are looked into.

You might be interested in
Convert mechanical energy into electric energy. What can he use?
Nina [5.8K]

Answer:

<h2>Generator </h2>

Explanation:

A generator converts mechanical energy into electrical energy

7 0
3 years ago
You are in charge of ordering the concrete for a basement wall concrete pour. The wall forms are all set up and ready. The wall
choli [55]

Answer:

189.15cy

Explanation:

To understand this problem we need to understand as well the form.

It is clear that there is four wall, two short and two long.

The two long are \rightarrow 120ft5in+2(10ft)

The two long are \rightarrow 122ft1in=122.08ft

The two shors are \rightarrow 86ft4.5in = 86.375ft

The height and the thickness are 14ft and 0.83ft respectively.

So we only calculate the Quantity of concrete,

Q_c = [(2*122.08)+(2*86-375)]*14*0.833\\Q_c=4864.02ft^3

That in cubic yards is equal to 180.15 (1cy=27ft^3)

Hence, we need order 5% plus that represent with the quantity

Q_{ordered}=1.05*180.15=189.15cy

8 0
3 years ago
Which of the following identifies the limitations of green engineering?
olga_2 [115]

Answer:

Resources and Cost

Explanation:

  • Cost: Sustainable choices can value a lot of as a result of they price makers more to provide. Thus, there'll always be an oversized initial investment once selecting a green element for your home.
  • Resources: Sustainable materials don't seem to be always as without delay available as their less eco-friendly alternatives.

Hope it helps!<3

4 0
2 years ago
Which of the following statements about resistance is TRUE?
valentina_108 [34]

Answer:

I think it's the no 3rd

Explanation:

hope this helps

3 0
2 years ago
Input signal to a controller is​
alexgriva [62]

Answer:

were the cord plugs in

Explanation:

4 0
3 years ago
Other questions:
  • How far do you jog each morning? You prefer to jog in different locations each day and do not have a pedometer to measure your d
    14·1 answer
  • Water of dynamic viscosity 1.12E-3 N*s/m2 flows in a pipe of 30 mm diameter. Calculate the largest flowrate for which laminar fl
    13·1 answer
  • 3. When performing overhead work on scaffolding, what protective measures must be taken to prevent objects
    9·1 answer
  • A saturated 1.5 ft3 clay sample has a natural water content of 25%, shrinkage limit (SL) of 12% and a specific gravity (GS) of 2
    11·1 answer
  • An air-conditioning system operates at a total pressure of 1 atm and consists of a heating section and a humidifier that supplie
    15·1 answer
  • The typical Canadian worker is able to produce 100 board feet (a unit of measure) of lumber or 1000 light bulbs per year. The wo
    12·1 answer
  • 1. In order for a team to accomplish its goal(s), it is NOT important for the team members to
    14·2 answers
  • Coving is a curved edge between a floor and a wall.<br> O True<br> O False
    13·2 answers
  • Problem 2
    11·1 answer
  • What computer program can you use to publish and share a research project with others?
    7·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!