Debora [2.8K]2 years ago
8 0

Answer:

a

Explanation:

the others dont make sense to be an engineer

You might be interested in
What is the difference Plastic vs elastic deformation.
Reika [66]

Answer:

What is the difference Plastic vs elastic deformation

Explanation:

The elastic deformation occurs when a low stress is apply over a metal or metal structure, in this process, the stress' deformation is temporary and it's recover after the stress is removed. In other words, this DOES NOT affects the atoms separation.

The plastic deformation occurs when the stress apply over the metal or metal structure is sufficient to deform the atomic structure making the atoms split, this is a crystal separation on a limited amount of atoms' bonds.

8 0
3 years ago
Which apparatus is likely to carry a ladder? (There may be more than one answer.)
Aloiza [94]
B and D
hope this helped
4 0
3 years ago
Create two arrays with 5 elements each: one will hold Strings and the second will hold integers. Write a program to ask the user
MrMuchimi

Answer:

#include <iostream>

#include <iomanip>

#include <string>

using namespace std;

int main() {

   string name[5];  

   int age[5];  

   int i,j;  

   for ( i = 0; i<=4; i++ ) {  

       cout << "Please enter student's name:";  

       cin >> name[i];  

       cout << "Please enter student's age:";  

       cin >> age[i];          

   }  

for (i=0;i<=4;i++){

   cout<<"Age of  "<< name[i]<<"  is  "<<age[i]<<endl;  

}

}

Output of above program is displayed in figure attached.

5 0
3 years ago
Three tool materials (high-speed steel, cemented carbide, and ceramic) are to be compared for the same turning operation on a ba
Tpy6a [65]

Answer:

Among all three tools, the ceramic tool is taking the least time for the production of a batch, however, machining from the HSS tool is taking the highest time.

Explanation:

The optimum cutting speed for the minimum cost

V_{opt}= \frac{C}{\left[\left(T_c+\frac{C_e}{C_m}\right)\left(\frac{1}{n}-1\right)\right]^n}\;\cdots(i)

Where,

C,n = Taylor equation parameters

T_h =Tool changing time in minutes

C_e=Cost per grinding per edge

C_m= Machine and operator cost per minute

On comparing with the Taylor equation VT^n=C,

Tool life,

T= \left[ \left(T_t+\frac{C_e}{C_m}\right)\left(\frac{1}{n}-1\right)\right]}\;\cdots(ii)

Given that,  

Cost of operator and machine time=\$40/hr=\$0.667/min

Batch setting time = 2 hr

Part handling time: T_h=2.5 min

Part diameter: D=73 mm =73\times 10^{-3} m

Part length: l=250 mm=250\times 10^{-3} m

Feed: f=0.30 mm/rev= 0.3\times 10^{-3} m/rev

Depth of cut: d=3.5 mm

For the HSS tool:

Tool cost is $20 and it can be ground and reground 15 times and the grinding= $2/grind.

So, C_e= \$20/15+2=\$3.33/edge

Tool changing time, T_t=3 min.

C= 80 m/min

n=0.130

(a) From equation (i), cutting speed for the minimum cost:

V_{opt}= \frac {80}{\left[ \left(3+\frac{3.33}{0.667}\right)\left(\frac{1}{0.13}-1\right)\right]^{0.13}}

\Rightarrow 47.7 m/min

(b) From equation (ii), the tool life,

T=\left(3+\frac{3.33}{0.667}\right)\left(\frac{1}{0.13}-1\right)\right]}

\Rightarrow T=53.4 min

(c) Cycle time: T_c=T_h+T_m+\frac{T_t}{n_p}

where,

T_m= Machining time for one part

n_p= Number of pieces cut in one tool life

T_m= \frac{l}{fN} min, where N=\frac{V_{opt}}{\pi D} is the rpm of the spindle.

\Rightarrow T_m= \frac{\pi D l}{fV_{opt}}

\Rightarrow T_m=\frac{\pi \times 73 \times 250\times 10^{-6}}{0.3\times 10^{-3}\times 47.7}=4.01 min/pc

So, the number of parts produced in one tool life

n_p=\frac {T}{T_m}

\Rightarrow n_p=\frac {53.4}{4.01}=13.3

Round it to the lower integer

\Rightarrow n_p=13

So, the cycle time

T_c=2.5+4.01+\frac{3}{13}=6.74 min/pc

(d) Cost per production unit:

C_c= C_mT_c+\frac{C_e}{n_p}

\Rightarrow C_c=0.667\times6.74+\frac{3.33}{13}=\$4.75/pc

(e) Total time to complete the batch= Sum of setup time and production time for one batch

=2\times60+ {50\times 6.74}{50}=457 min=7.62 hr.

(f) The proportion of time spent actually cutting metal

=\frac{50\times4.01}{457}=0.4387=43.87\%

Now, for the cemented carbide tool:

Cost per edge,

C_e= \$8/6=\$1.33/edge

Tool changing time, T_t=1min

C= 650 m/min

n=0.30

(a) Cutting speed for the minimum cost:

V_{opt}= \frac {650}{\left[ \left(1+\frac{1.33}{0.667}\right)\left(\frac{1}{0.3}-1\right)\right]^{0.3}}=363m/min [from(i)]

(b) Tool life,

T=\left[ \left(1+\frac{1.33}{0.667}\right)\left(\frac{1}{0.3}-1\right)\right]=7min [from(ii)]

(c) Cycle time:

T_c=T_h+T_m+\frac{T_t}{n_p}

T_m= \frac{\pi D l}{fV_{opt}}

\Rightarrow T_m=\frac{\pi \times 73 \times 250\times 10^{-6}}{0.3\times 10^{-3}\times 363}=0.53min/pc

n_p=\frac {7}{0.53}=13.2

\Rightarrow n_p=13 [ nearest lower integer]

So, the cycle time

T_c=2.5+0.53+\frac{1}{13}=3.11 min/pc

(d) Cost per production unit:

C_c= C_mT_c+\frac{C_e}{n_p}

\Rightarrow C_c=0.667\times3.11+\frac{1.33}{13}=\$2.18/pc

(e) Total time to complete the batch=2\times60+ {50\times 3.11}{50}=275.5 min=4.59 hr.

(f) The proportion of time spent actually cutting metal

=\frac{50\times0.53}{275.5}=0.0962=9.62\%

Similarly, for the ceramic tool:

C_e= \$10/6=\$1.67/edge

T_t-1min

C= 3500 m/min

n=0.6

(a) Cutting speed:

V_{opt}= \frac {3500}{\left[ \left(1+\frac{1.67}{0.667}\right)\left(\frac{1}{0.6}-1\right)\right]^{0.6}}

\Rightarrow V_{opt}=2105 m/min

(b) Tool life,

T=\left[ \left(1+\frac{1.67}{0.667}\right)\left(\frac{1}{0.6}-1\right)\right]=2.33 min

(c) Cycle time:

T_c=T_h+T_m+\frac{T_t}{n_p}

\Rightarrow T_m=\frac{\pi \times 73 \times 250\times 10^{-6}}{0.3\times 10^{-3}\times 2105}=0.091 min/pc

n_p=\frac {2.33}{0.091}=25.6

\Rightarrow n_p=25 pc/tool\; life

So,

T_c=2.5+0.091+\frac{1}{25}=2.63 min/pc

(d) Cost per production unit:

C_c= C_mT_c+\frac{C_e}{n_p}

\Rightarrow C_c=0.667\times2.63+\frac{1.67}{25}=$1.82/pc

(e) Total time to complete the batch

=2\times60+ {50\times 2.63}=251.5 min=4.19 hr.

(f) The proportion of time spent actually cutting metal

=\frac{50\times0.091}{251.5}=0.0181=1.81\%

3 0
3 years ago
A negative pressure respirator brings fresh air to you through a hose<br>A) True<br>B)False​
madreJ [45]

Answer:FALSE

Explanation: A negative pressure respirator is a respiratory system which is known to have a low air pressure inside the mask when compared to the air pressure on the outside during Inhalation.

Most of the personal protective equipment (PPE) which are in use in various industries are examples of Negative pressure respirator device,any leak or damage done to the device will allow the inflows of harmful and toxic Air into the person's respiratory system. AIR SUPPLY SYSTEMS ARE KNOWN TO SUPPLY FRESH UNCONTAMINATED AIR THROUGH AIR STORED INSIDE COMPRESSED CYLINDERS OR OTHER SOURCES AVAILABLE.

8 0
3 years ago
Read 2 more answers
Other questions:
  • Consider a vortex filament of strength in the shape of a closed circular loop of radius R. Obtain an expression for the velocity
    10·1 answer
  • What does WCS stand for? A. Western CAD System B. Worldwide Coordinate Sectors C. World Coordinate System D. Wrong CAD Settings
    10·1 answer
  • You live on a street that runs East to West. You just had 2 inche of snow and you live on the North side of the street. You retu
    14·1 answer
  • Name the important trees of tropical monsoon forest​
    11·1 answer
  • 7. A single-pole GFCI breaker is rated at
    9·1 answer
  • Water enters an ice machine at 55°F and leaves as ice at 25°F. If the COP of the ice machine is 2.45 during this operation, dete
    7·1 answer
  • You need to bake 2 dozen chocolate chip
    12·1 answer
  • What is one of the most common ways in which workers get hurt around machines?
    14·1 answer
  • What the minimum wire size for a general residential application on a 20 A circuit
    7·1 answer
  • Does anyone know what this is​
    10·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!