Answer:
Explanation:
Given data:
initial construction co = 0.286 wt %
concentration at surface position cs = 0 wt %
carbon concentration cx = 0.215 wt%
time = 7 hr

for 0.225% carbon concentration following formula is used

where, erf stand for error function




from the table erf(Z) value = 0.751 lie between (z) = 0.80 and z = 0.85 so by inteerpolation we have z = 0.815
from given table



x = 0.002395 mm
Answer:
V = 0.5 m/s
Explanation:
given data:
width of channel = 4 m
depth of channel = 2 m
mass flow rate = 4000 kg/s = 4 m3/s
we know that mass flow rate is given as

Putting all the value to get the velocity of the flow


V = 0.5 m/s
Answer:
a) ∝ and β
The phase compositions are :
C
= 5wt% Sn - 95 wt% Pb
C
= 98 wt% Sn - 2wt% Pb
b)
The phase is; ∝
The phase compositions is; 82 wt% Sn - 91.8 wt% Pb
Explanation:
a) 15 wt% Sn - 85 wt% Pb at 100⁰C.
The phases are ; ∝ and β
The phase compositions are :
C
= 5wt% Sn - 95 wt% Pb
C
= 98 wt% Sn - 2wt% Pb
b) 1.25 kg of Sn and 14 kg Pb at 200⁰C
The phase is ; ∝
The phase compositions is; 82 wt% Sn - 91.8 wt% Pb
Csn = 1.25 * 100 / 1.25 + 14 = 8.2 wt%
Cpb = 14 * 100 / 1.25 + 14 = 91.8 wt%
Hi! bridges could have been collapse due to an error made by the engineers during construction.