Answer:
Explanation:
a. Cast iron or Aluminium alloy are typically used. Aluminium is much lighter in weight and it can transfer heat better to the coolant. While Cast Iron is typically stronger and is thus still used by the manufacturers.
b. Copper can be used as a condensing heat exchanger for hot steam due to its optimal thermal properties and its ability to resist corrosion.
c. high-speed steel are perfect for producing drill bits because of its hardness and resistance to heat to an extent. Drill bits tend to produce heat as a result of the friction between it and the material to be drilled.
d. lead can be used as a container for strong acids because of its anti-corrosive properties
e.zinc and copper can be used as fuel in pyrotechnics mainly due to the fact that burn with refreshing colours. Aluminium can also be used.
f. Platinum is the metal that best suits this purpose because of its high melting point and resistivity to oxidation.
Answer:
Explanation:
The "Move Over law" varies by state, but generally requires you vacate the adjacent lane (the one you're currently traveling in), or slow down. Some states have specific speed requirements; others require only "safe and prudent" speed.
The sort of parked vehicles that require you to "move over" also vary by state. It would be "safe and prudent" to move over for <em>any</em> vehicle parked on the shoulder, especially if there are people or animals around those vehicles.
Answer:
Jordan has more green paints
Explanation:
Given


Required
Which paint does he have more?
For better understanding, it's better to convert both measurements to decimal.
For the green paint:


For the blue paint:


By comparison:

<em>This means that Jordan has more green paints</em>
The lead time of the actual batch will be in
<h3>What is Processing Time?</h3>
This refers to the amount of time which is taken for a processor to run a procedure and return a result.
We can see that a batch of 1000 is split so that they each have 10 smaller batches which has an equal size of 100 each, then if the processing time is 2 mins per machine and the set up time is 30 mins.
Hence, when this batch is processed over a serial line of 5 machines, then the lead time of the actual batch would be 2950 in minutes
Read more about processing time here:
brainly.com/question/18444145