Answer:
It seems that you have missed the necessary options for us to answer this question, so I had to look for it. Anyway, here is the answer. Samaira needs to rent some tents for an outdoor family reunion in July, so the type of tent for Samaira to rent so that her family members are protected from the heat of the sun is SMOOTH and WHITE TENT. Hope this answer helps.
What is the variable?
~<em>the</em><em> </em><em>price</em><em> </em><em>is</em><em> </em><em>the</em><em> </em><em>variable</em><em>.</em>
What happens to demand?
~It'll go down. Since the price of snow blowers will increase then the quantity demanded will go down.
Hope this helps- have a good day bro cya)
Hi there!
Recall the equation for electric potential of a point charge:

V = Electric potential (V)
k = Coulomb's Constant(Nm²/C²)
Q = Charge (C)
r = distance (m)
We can begin by solving for the given electric potentials. Remember, charge must be accounted for. Electric potential is also a SCALAR quantity.
Upper right charge's potential:

Lower left charge's potential:

Add the two, and subtract from the total EP at the point:

The remaining charge must have a potential of 2036.25 V, so:

Answer:
El trabajo realizado para subir los últimos 500 metros es 318727,5 joules.
Explanation:
Por la definición de trabajo sabemos que el montañero debió contrarrestar trabajo causado por la gravedad terrestre. Si asumimos que el cambio de la altura es muy pequeño en comparación con el radio del planeta (6371 kilómetros vs. 0,5 kilómetros), entonces podemos considerar que la aceleración gravitacional es constante y la ecuación de trabajo (
), medido en joules, que reducida a:
(1)
Donde:
- Masa del montañero, medido en kilogramos.
- Aceleración gravitacional, medida en metros por segundo al cuadrado.
- Distancia vertical de ascenso del montañero, medida en metros.
Si tenemos que
,
y
, entonces el trabajo realizado por el montañero para subir es:


El trabajo realizado para subir los últimos 500 metros es 318727,5 joules.