Answer:
W = 0
Explanation:
We are given with, a construction worker is carrying a load of 40 kg over his head and is walking at a constant velocity. He travels a distance of 50 m.
The work done by an object is given by :

F = ma
So,

m is mass
a is acceleration
d is displacement
The worker is moving with constant velocity, its acceleration will be 0. So, the work done by the worker is 0.
This question involves the concepts of dynamic pressure, volume flow rate, and flow speed.
It will take "5.1 hours" to fill the pool.
First, we will use the formula for the dynamic pressure to find out the flow speed of water:

where,
v = flow speed = ?
P = Dynamic Pressure = 55 psi
= 379212 Pa
= density of water = 1000 kg/m³
Therefore,

v = 27.54 m/s
Now, we will use the formula for volume flow rate of water coming from the hose to find out the time taken by the pool to be filled:

where,
t = time to fill the pool = ?
A = Area of the mouth of hose =
= 1.98 x 10⁻⁴ m²
V = Volume of the pool = (Area of pool)(depth of pool) = A(1.524 m)
V =
= 100.1 m³
Therefore,

<u>t = 18353.5 s = 305.9 min = 5.1 hours</u>
Learn more about dynamic pressure here:
brainly.com/question/13155610?referrer=searchResults
So it could follow the correct mass for the atom
The sun's energy influences climate in various ways. For example the latitudes at the equator receive more energy from the sun and therefore have warmer temperatures, On the other hand the sun's energy influences precipitation in a climate by driving the water cycle which determines precipitation.The sun is what makes the water cycle take place. That is the sun provides energy or heat to the earth; the heat causes liquid and frozen water to evaporate into water vapor gas, which rises high in the sky to form clouds ( precipitation), that in turn give us rain
Answer:
1. 2.5s
Explanation:
1. For time, divide Distance / speed
25m / 10
=2.5s