Answer:
7.2 V
Explanation:
The three batteries are connected in series to the terminals of the phone: it means that they are connected along the same branch, so the current flowing through them is the same.
This also means that the potential difference across the phone will be equal to the sum of the voltages provided by each battery.
Here, the voltage provided by each battery is
V = 2.4 V
So, the overall voltage will be
V = 2.4 V + 2.4 V + 2.4 V = 7.2 V
Answer:
I'm pretty sure the answer is D
Explanation:
Honestly it's just a guess so let me know if it's right :3
The second major reason for the difference in gravity at differentlatitudes is that the Earth's equatorial bulge (itself also caused by centrifugalforce from rotation) causes objects at the Equator to be farther from the planet's centre than objects at the poles.
Given the value of the mass of each boxes, the work done in lifting the boxes to the given height is 1.6 × 10⁵J.
<h3>
Work done</h3>
Work done is simply defined as the energy transfer that takes place when an object is either pushed or pulled over a certain distance by an external force. It is expressed as;
W = F × d
Where F is force applied or Weight and d is distance
Also Force = Weight = mass × acceleration due to gravity.
Since gravity is acting on the boxes as it been lift
W = Weight × height from ground level
W = mg × d
Where m is mass of the boxes, g is accelration due to gravity( g = 9.8m/s² ) and d is distance from ground level.
Given the data in the question;
- Since each box has a mass of 7.89 kg
- Mass of the 345 boxes = 345 × 7.89 kg = 2722.05kg
- Distance or height d = 6.0m
To determine the work done, we substitute our values into the expression above.
W = mg × d
W = 2722.05kg × 9.8m/s² × 6.0m
W = 160056.5kgm²/s²
W = 160056.5J
W = 1.6 × 10⁵J
Therefore, Given the value of the mass of each boxes, the work done in lifting the boxes to the given height is 1.6 × 10⁵J.
Learn more about work done here: brainly.com/question/26115962