1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
lora16 [44]
2 years ago
13

PLS HELP ASAP FIRST CORRECT ANSWER GETS BRAINLIEST​

Mathematics
1 answer:
Anna11 [10]2 years ago
6 0
Using Pythagorean, a^2 + b^2 = c^2
16 +x^2 = 36.69
Then subtract the 16 from 36.69, which is 23.69
And finally take the square root of that, giving you 4.87
You might be interested in
A rotating light is located 16 feet from a wall. The light completes one rotation every 2 seconds. Find the rate at which the li
otez555 [7]

Answer:

a

Step-by-step explanation:

answer is a on edg

3 0
3 years ago
Which equation is true if S = -3
Effectus [21]
<h3>i would like to help BUT where is the question ????</h3><h2>ԅ(¯﹃¯ԅ)ԅ(¯﹃¯ԅ)</h2>
8 0
3 years ago
Read 2 more answers
How many times does a thousand go into 1,000,000,000
Harman [31]
The answer would be 1,000,000 times
7 0
3 years ago
Read 2 more answers
A furniture shop refinishes chairs. Employees use two methods to refinish chairs. Method I takes 0.5 hours and the material cost
sveta [45]

Answer:

With Method I, they should plan to refinish 92 chairs and with Method II they should plan to refinish 70 chairs.

Step-by-step explanation:

This problem can be solved by means of a system of equations, that is to say a system that in this case will contain 2 linear equations with two variables: "x" and "y".

First you must define what your variables x and y are:

  • x: Chairs refinished by method I.
  • y: Chairs refinished by method II.

On the one hand, you know that between method I and method II they plan to work 151 hours. In method I, each chair takes 0.5 hours of work, this means that to obtain the total amount of time it takes to work in the "x" chairs by this method, 0.5 must be multiplied by the number of chairs. You can apply the same reasoning to calculate the total amount of time it takes to work on the "y" chairs by method II knowing that each chair takes 1.5 hours. Everything said above is represented by the equation:

<em>\frac{1}{2} *x+\frac{3}{2} *y=151 Equation (A)</em>

In the equation the values ​​0.5 and 1.5 are represented in the form of a fraction (1/2 and 3/2 respectively) to be able to solve more in a way how the system of equations.

On the other hand, to state the other equation of the system, it must be taken into account that by method I the material costs $ 9 for each chair and by method II the material costs $ 7 for each chair. To determine the value of the material in each method, multiply the value of each chair by the amount of chairs refinished in each case. And the sum of the value of the materials of both methods must be $ 1318. This is represented by the equation:

<em>9*x+7*y=1318 Equation (B)</em>

Having both equations, you can solve the system. There are several methods to solve it, but one of the easiest and most widely used methods is substitution. This consists of isolating one of the variables from one of the equations and replacing it in the other equation.

In this case you can choose to isolate the variable x from equation B, resulting in:

x=\frac{1318}{9} -\frac{7}{9} *y <em>Equation (C)</em>

It is always preferable to work in fractions for convenience to solve the calculations.

Now you replace the expression obtained from x in equation A, obtaining:

\frac{1}{2} *(\frac{1318}{9} -\frac{7}{9} *y)+\frac{3}{2} =151

Now you have an equation with a variable, "y", which can be solved, that is, you can get the value of "y". So "y"=70

Remembering that the variable "y" is the number of chairs refinished by method II, <u><em>the value of "y" means that 70 chairs by that method were refinished</em></u>.

To calculate the value of "x", you simply replace the value of "y" in either of the two equations (A) or (B) of the system and solve the equation. Or you can replace the value of "y" in equation (C): Either way the result must be the same: "x"=92

Remembering that the variable "x" is the number of chairs refinished by method I, <u><em>the value of "x" means that 92 chairs by that method were refinished.</em></u>

6 0
3 years ago
Help please!!!!!
Sergio [31]

Answer:

  • a. image 1

Step-by-step explanation:

<u>Given function:</u>

  • f(x) = 2*3ˣ

<u>Plot two points and check which graph has those:</u>

  • f(0) = 2*3⁰ = 2

and

  • f(1) = 2*3¹ = 6

Points (0, 2) and (1, 6) are correct on the image 1 with blue graph

7 0
3 years ago
Other questions:
  • How do I simplify the question in the red boy
    8·2 answers
  • Sidney spent 30% of her monthly salary on a new laptop last month. Then she spent 50% of her salary to pay her monthly bills. Sh
    12·1 answer
  • Find the difference between the fastest girls time and the slowest girl time. Barbra ran 3 3/10, Donna ran 2 4/5 , Cindy ran 4 3
    15·1 answer
  • HEY YOU! YEAH, YOU!! PLEASE HELP A FELLOW STUDENT SUFFERING FROM THE TEACHINGS OF HONORS MATH!!! ILL MARK BRAINLIEST IF YOU DO..
    13·1 answer
  • How many pounds are 49 kg? And what about 50 kg? I need exact answers. Thnxs?
    15·1 answer
  • There is an attachment below...I need this answers ASAP with work...please write it on a piece of paper if you can and send a ph
    15·2 answers
  • Which expression can be used to find 20 percent of 927
    14·2 answers
  • 15. PLZ HELP For each part below, use the figure to fill in the blank. If necessary, you may learn what the markings on a figure
    15·1 answer
  • Need help ASAP! Will give brainliest for decent answer :)
    15·1 answer
  • Hallooo can someone help pls?
    7·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!