Answer:
Explanation:
Enforcing OSHA, Occupational Safety and Health Administration, standards is not a job for electricians, lawmakers or tax collectors. The right answer is safety inspectors.
Answer:
as slated in your solution, if delay time is 2.30 mins, hence 9 vehicle will be on queue as the improved service commenced.
Explanation:
4 vehicle per min, in 2 mins of the delay time 8 vehicles while in 0.3 min average of 1 vehicle join the queue. making 9 vehicle maximum
engineering approach their work by finding new solutions to their problems. like if two things dont go together in an invention, they will find another way
Answer:
Explanation:
In Engineering and Physics a Phasor That is a portmanteau of phase vector, is a complex number that represents a sinusoidal function whose Amplitude (A), Angular Frequency (ω), and Initial Phase (θ) are Time-invariant.
For the step by step solution to the question you asked, go through the attached documents.
5x-30=2
5x=2+30 (not -28) when the -30 is brought over to the RHS, 30 should be added to 2 instead of subtracted
hence, 5x=32
x = 6.4