1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Kitty [74]
3 years ago
10

Consider a catchment that has a total area of 2.1 acres. Runoff from the entire catchment flows into one pipe inlet. Part of the

catchment is a softball field (1.5 ac) and the other part is a set of paved tennis courts (0.6 ac). The softball field has a C value of 0.3 and a time of concentration of 7 minutes, and the paved area has a C value of 0.95 and a time of concentration of 2 minutes. The IDF curve is given by i =100/(tc + 10) where i is in in/hr and tc is in minutes. Determine the design storm intensity and flow rate for the following cases: (a) The usual method based on the entire drainage area contributing to flow. (b) A modified method that assumes that only the paved tennis courts contribute to flow. (c) A different modified method that assumes a time of concentration of 2 minutes, and an approximation that the entire tennis court region contributes flow and 2/7 of the softball region contributes flow. Comment on the results and their impact on design. Is it always best to use method (a)

Engineering
1 answer:
sattari [20]3 years ago
5 0

Find the given attachment

You might be interested in
Write a statement to print the data members of InventoryTag. End with newline. Ex: if itemID is 314 and quantityRemaining is 500
Advocard [28]

Answer:

#include <stdio.h>

typedef struct InventoryTag_struct {

int itemID;

int quantityRemaining;

} InventoryTag;

int main(void) {

InventoryTag redSweater;

redSweater.itemID = 314;

redSweater.quantityRemaining = 500;

/* Your solution goes here */

printf("Inventory ID: %d, Qty: %d\n",redSweater.itemID,redSweater.quantityRemaining);

getchar();

return 0;

}

Explanation:

7 0
3 years ago
Hydraulic fluid is primarily used to
Lerok [7]

Answer:

hydraulic flute is energy transfer medium in all hydraulic system this simple function is only achieved by flute that does not easily trap gases trapped gas and forming problems should bring a higher level of compressibility to a fluid than its usual at a point to support a very steep pass trekking system

8 0
3 years ago
At steady state, air at 200 kPa, 325 K, and mass flow rate
Vera_Pavlovna [14]
Letra A

A letra

A.
Thank
3 0
3 years ago
Which website suffixes are usually the least credible? Check all that apply.
zmey [24]
.com hope this helps
7 0
3 years ago
Read 2 more answers
Isn't this website cheating?
Orlov [11]

Answer: What website?

Explanation:

8 0
3 years ago
Read 2 more answers
Other questions:
  • A rectangular channel 6 m wide with a depth of flow of 3m has a mean velocity of 1.5 m/sec. The channel undergoes a smooth, grad
    7·1 answer
  • 1. Design a circuit, utilizing set/reset coils where PB 1 starts Motor 1 and PB2 stops Motor 1. Pressing and releasing either pu
    14·1 answer
  • An object is supported by a crane through a steel cable of 0.02m diameter. If the natural swinging of the equivalent pendulum is
    6·1 answer
  • How do you connect several springs to increase the equivalent stiffness? What is one example from industry or other real-life si
    7·1 answer
  • Prove the following languages are nonregular, once using the pumping lemma and once using the Myhill-Nerode theorem. When using
    15·1 answer
  • E xercise 17.1.2: For each of the transactions of Exercise 17.1.1, add the read- and write-actions to the computation and show t
    12·1 answer
  • You are working as an electrical technician. One day, out in the field, you need an inductor but cannot find one. Looking in you
    11·1 answer
  • The structure of PF3(C6H5)2 is trigonal bipyramidal, with one equatorial and two axial F atoms which interchange positions when
    15·1 answer
  • What can be used to relieve stress in a weld.
    12·2 answers
  • The proposed grading at a project site will consist of 25,100 m3 of cut and 23,300 m3 of fill and will be a balanced earthwork j
    8·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!