Answer:
Height reached will be 28.35 m
Explanation:
Here we can use the work energy theorem to find the maximum height
As we know by work energy theorem
Work done by gravity + work done by friction = change in kinetic energy

now we will have



so here the height raised by the stone will be 28.35 m from the ground after projection in upward direction
If you take 50 meters and divide by 23.1 seconds, you will get 2.16 meters per second.
So his average speed is 2.16 m/s.
Answer:
The correct option is;
D. Fabrication
Explanation:
A workflow flow is a detailed business process consisting of a series of required interconnected tasks in directed graph format that is executable by workflow management system.
Considering each of the options, we have
A. Work center
This consists of part of the transformation input to output. The location
B. Project
This is the unique identifier of the task to be processed
C. Assembly line
Forms part of the required input where transformation takes place and items are being processed within the assembly line
D. Fabrication
Here the item is fixed, without motion, therefore this is not considered a major work flow structure
E. Continuous flow
Here again, the items are being processed and are in motion, which constitutes a workflow structure.
bhdfbvhfdbvhhfhvfhdf vfdhybvghbhdf
Answer:
C. 3.00 s
Explanation:
Given:
Δy = 1.80 m − 46.0 m = -44.2 m
v₀ = 0 m/s
a = -9.8 m/s²
Find: t
Δy = v₀ t + ½ at²
-44.2 m = (0 m/s) t + ½ (-9.8 m/s²) t²
t = 3.00 s