1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Alexxandr [17]
3 years ago
6

What does this work for

Engineering
1 answer:
Anastaziya [24]3 years ago
8 0

Answer:

it allows your dash board to light up you MPH RPM and all the other numbers on the spadomter

Explanat

You might be interested in
1) (35 pts) For the curved lifting bar, calculate the stresses at A, B, and the centroid of the section.
Juliette [100K]

I know the Answer but first you should add me as Brainliest and I Will edit this to Answer.

3 0
2 years ago
What are the factors that influence the power input to the compressor?
Lena [83]

Answer:

option e is correct answer

5 0
2 years ago
What is the best source of information about the world?
iogann1982 [59]
To be honest theres a lot...
8 0
3 years ago
Antihistamines are used to treat_______.
gladu [14]

Answer:

<h2>Antihistamines are used to treat hay fever.</h2><h3>I hoped it helped</h3><h2>#Se xy EMPRESS</h2>
8 0
3 years ago
Read 2 more answers
Why is the contractor normally required to submit a bid bond when making a proposal to an owner on a competitively bid contract?
just olya [345]

Answer:

It serves as a guarantee that the contractor who wins the bid will honor the terms of the bid after the contract is signed.

Explanation:

A bid bond is a type of construction bond that protects the obligee in a  construction bidding process.

A bid bond typically involves three parties:

The obligee; the owner or developer of the construction project under bid. The principal; the bidder or proposed contractor.

The surety; the agency that issues the bid bond to the principal example insurance company or bank.

A bid bond generally serves as a guarantee that the contractor who wins the bid will honor the terms of the bid after the contract is signed.

3 0
3 years ago
Other questions:
  • Write a grammar for a language whose sentences start with an even and non-zero number of x’s, end with an odd number of z’s, and
    11·1 answer
  • A gas stream contains 4.0 mol % NH3 and its ammonia content is reduced to 0.5 mol % in a packed absorption tower at 293 K and 10
    14·1 answer
  • What is a motor cycle motor made out of
    5·2 answers
  • According to fire regulations in a town, the pressure drop in a commercial steel, horizontal pipe must not exceed 2.0 psi per 25
    5·1 answer
  • g A pedometer treats walking 2,000 steps as walking 1 mile. Write a program whose input is the number of steps, and whose output
    10·2 answers
  • A non-linear analog force sensor outputs the following voltages for different forces.
    7·1 answer
  • The correct area in sq. Inches and sq. Feet is: Select one: a. 966.76 sq. Inches and 8.056 sq. Feet b. 96.676 sq. Inches and 8.0
    9·1 answer
  • N DevOps, high levels of automation are expected, which increases productivity. Which fact illustrates this productivity increas
    8·1 answer
  • Introduce JTA and JT
    8·1 answer
  • Analyze the example of this band saw wheel and axle. The diameter of the wheel is 14 inches. The diameter of the axle that drive
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!