1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Alexxandr [17]
2 years ago
6

What does this work for

Engineering
1 answer:
Anastaziya [24]2 years ago
8 0

Answer:

it allows your dash board to light up you MPH RPM and all the other numbers on the spadomter

Explanat

You might be interested in
جائت فكرة ربط الحواسيب لغرض نقل البيانات و مشاركتها و بعدها بفتره قصيره جائت إمكانية مشاركة الموارد بين الحواسيب صح ام خطأ​
melamori03 [73]

Answer:

بدلاً من ذلك يُشار إليه باسم مشاركة أو مشاركة شبكة ، الدليل المشترك هو دليل أو مجلد يمكن الوصول إليه من قبل العديد من المستخدمين على الشبكة. هذه هي الطريقة الأكثر شيوعًا للوصول إلى المعلومات ومشاركتها على شبكة محلية

Explanation:

5 0
2 years ago
Read 2 more answers
Given a force of 72 lbs at a distance of 15 ft, calculate the moment produced.​
Elis [28]

Answer:

1425.78 N.m

Explanation:

Moments of force is calculated as ;

Moments= Force * distance

M= F*d

The S.I unit for moment of force is Newton-meter (N.m)

Given in the question;

Force = 72 lbs

1 pound = 4.45 N

72 lbs = 4.45 * 72=320.4 N

Distance= 15 ft

1ft= 0.3048 m

15 ft = 15*0.3048 = 4.57 m

d= 4.57 m

M= F*d

M=320.4*4.57 =1425.78 N.m

5 0
3 years ago
.) If the charges attracting each other in the problem above have equal magnitude, what is the magnitude of each charge?
Sedaia [141]

Answer:

Not seeing any other information, the best answer I can give is 2m.

Explanation:

M = magnitude

You see, if they have an equal charge, and you add them, it'd be 2 * m, or 2m.

8 0
3 years ago
I m from India<br><br><br>5603642259 pd 123456 ​
Volgvan

Answer:

Hi there...

Explanation:

Please give me brainliest :)

6 0
2 years ago
Read 2 more answers
A plastic molding machine produces a product whose annual demand is in the millions.
BabaBlast [244]

Answer:

a. 78.4 pieces/hr

b. $0.1806/min

c. $1.34/piece

Explanation:

(a) With a cycle time Tc = 45 sec = 0.75 min.

Production rate, Rp = 60/0.75 = 80 pieces/hr.

Let us factor in the 98% proportion uptime, so Production rate, Rp = 0.98*(80) = 78.4 pieces/hr

Quantity of product annualy = 6000 *(78.4) = 470,400 pieces/yr

(b) Equipment cost rate, Ceq = 500,000(1.30)/(60 x 10 x 6000) = $0.1806/min.

(c) Cost per piece of mould, Ct = 100,000/1,000,000 = $0.10/piece

Cost rate of labour ,CL = 18.00(0.20) = $3.60/hr = $0.06/min

Conclusively, cost per piece, Cpc = 1.20(0.88) + (0.06 + 0.1806)(0.75) + 0.10 = $1.34/piece

8 0
3 years ago
Other questions:
  • Explain the use of the Kanban system in a production line?
    7·1 answer
  • What is productivity as it relates to labor?
    11·1 answer
  • The snowmobile has a weight of 250 lb, centered at G1, while the rider has a weight of 150 lb, centered at G2. Ifh=3ft, determin
    11·1 answer
  • The 5 ft wide gate ABC is hinged at C and contacts a smooth surface at A. If the specific weight of the water is 62.4 lb/ft3 , f
    8·1 answer
  • Many of the products that we eat and drink are advanced manufactured products. Is this statement TRUE or FALSE?
    12·1 answer
  • Please help me:<br> Use the Node analysis to find the power of all resistors
    9·1 answer
  • Eugene runs a company that manufactures bricks. The manufacturing process consumes a lot of energy and causes pollution, which t
    9·2 answers
  • What is 39483048^349374*3948048/3i4u4
    15·1 answer
  • I am sending an email to my teacher. Is this mature enough?
    15·2 answers
  • How many meters per second is 100 meters and 10 seconds
    12·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!