Answer: Not Enough Time
Often, the deadline date is decided before the project starts and is non-negotiable. This deadline results in a headlong rush to get started on the assumption, the sooner you begin coding, the sooner you'll finish.
A rush to start coding is almost always the wrong approach. It is important to spend the time to create a good design. Not having a good design leads to continuing changes throughout the development phase. When this happens, time and budget are consumed at a rapid rate.
Solution: Make time to create a good design. Don't be tempted to jump straight in and begin coding. Assign time to this task and the rest of the project will run much better. It will improve your reputation when you deliver something that fulfils the customers' expectations and works the first time correctly.
Explanation:
Problem-Solving Tip: When cutting an FBD through an axial member, assume that the internal force is tension and draw the force arrow directed away from the cut surface. If the computed internal force value turns out to be a positive number, then the assumption of tension is confirmed.
Answer:
Step 1 of 3
Case A:
AISI 1018 CD steel,
Fillet radius at wall=0.1 in,
Diameter of bar
From table deterministic ASTM minimum tensile and yield strengths for some hot rolled and cold drawn steels for 1018 CD steel
Tensile strength
Yield strength
The cross section at A experiences maximum bending moment at wall and constant torsion throughout the length. Due to reasonably high length to diameter ratio transverse shear will be very small compared to bending and torsion.
At the critical stress elements on the top and bottom surfaces transverse shear is zero
Explanation:
See the next steps in the attached image