Answer: I MOST DEFENTALLY SHIP CORPSE AND SYKKUNO YASSSS
Explanation:
Can u plz mark the branliest
#Corpse and Sykkuno
The problem of the Graduation date about the cover was that we had a new name on the back of the earth lol but
Answer:
I think reduce your following distance
Answer: The answer is d.
Explanation:
The ship is acted by two forces, gravity (going always downward), and an upward force due to Archimedes' principle, that says that "any body submerged in a liquid, receives an upward force, which value is equal to the weight of the volume of the liquid that it displaces".
In order to be able to evaluate this force, we would need to know what percentage of the volume of the ship is submerged, and this depends on the density of the ship.
As we have no information regarding the material from which the ship is built, and because we only know that the ship "floats" (which means that is not 100% submerged in the ocean), we have not enough information to determine the volume of water displaced.
Answer:
Explanation:
The Turnaround time is the amount of time that elapses between the job arriving and completing. We assume that all jobs arrive at time 0, the turnaround time will simply be the time that they complete.
Round Robin:
we assume that the time quantum of the scheduler is 1 second.The table below gives a break down of which jobs will be processed during each time quantum. A asterisk(*) indicates that the job completes during that quantum.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
A B C D E A B C* D E A B D E A B D* E A B E A B* E A E A E* A A
C* = 8
D*=17
B*=23
E*=28
AVERAGE TURNAROUND = (8+17+23+28+30)/5 =106/5 = 21.2 MINUTES
B) PRIORITY SCHEDULING:
1-6 7-14 15-24 25-26 27-30
B E A C D
AVERAGETURNAROUND =(6+14+24+26+30)/5 = 100/5 = 20 MINUTES.
C)FCFS
1-10 11-16 17-18 19-22 23-30
A B C D E
AVERAGE TURNAROUND =(10+16+18+22+30)/5 = 96/5=19.2 MINTUES
D)SJF
1-2 3-6 7-12 13-20 21-30
C D B E A
AVERAGE TURNAROUND - (2+6+12+20+30)/5 =70/5 =14 MINUTES.