I think that is clearly in the name. It will use 850W at 100% load if the cos¿ = 1
Answer:
x' =2000201.2 λ
Explanation:
Given that
m = 3
We know that path difference is given as
Δx = m λ
x' - x = m λ
Given that x= 2,000,198.2λ
x'=Distance between far distance slits
x=Distance between near distance slits
Now by putting the values in the above equation e get
x' = 2,000,198.2λ + 3 λ
x' =2000201.2 λ
Therefore the answer will be 2000201.2 λ.
Should be 28 meters per second.
140m ÷ 5s
Work = force x distance
62,500 joules = boulder's weight x 25 meters
Divide each side by 25 meters:
Boulder's weight = 62,500 joules / 25 meters = 2,500 newtons
That's about 562 pounds