Explanation:
Diesel cycle:
All diesel engine work on diesel cycle .In diesel cycle there are four process .These processes are as follows
1. Adiabatic reversible compression
2.Heat addition at constant pressure
3.Adiabatic reversible expansion
4.Constant volume heat rejection
In general compression ratio in diesel engine is high as compare to petrol engine.But the efficiency of diesel cycle is less as compare to petrol cycle for same compression ratio.
Applications of diesel cycle:
Generally diesel cycle used for heavy vehicle or equipment because heavy vehicle or equipment is required high initial torque.So this cycle have lots of applications such as in industrial machining,in trucks,power plant,in mining ,in defense or military,large motors ,compressor and pump etc.
Answer:
Explanation:
You can utilize barbed clusters to store inadequate grids. On the off chance that there are a great many lines yet each line has just 4 or 5 associations with different segments, at that point as opposed to utilizing a 1000x1000 cluster you can utilize a 1000 line rough exhibit while you simply store the components that the present section has association with another segment. Other utilization can be done on account of query tables. Query tables will be tables which have different qualities concerning a solitary key where the quantity of qualities isn't fixed. Aside from this, barbed clusters have an exceptionally set number of utilization cases. Multidimensional exhibits then again have plenty of utilizations. It is utilized to store a great deal of information reliably on the grounds that the greater part of the information is put away is steady concerning which section compares to what information. Aside from that it very well may be utilized to make thick diagrams or sparse(not effective), plotting information. Another utilization case would be used as an impermanent stockpiling for the figurings that need to tail them and utilize the past information like in powerful programming.
Answer:
Both come from the sun
Both are reusable sources
and both don't cause pollution
Explanation:
Answer:
a)
1) R16C ; Tn = 17 TMU
2) G4A ; Tn = 7.3 TMU
3) M10B5 ; Tn = 15.1 TMU
4) RL1 ; Tn = 2 TMU
5) R14B ; Tn = 14.4 TMU
6) G1B ; Tn = 3.5 TMU
7) M8C3 ; Tn = 14.7 TMU
8) P1NSE ; Tn = 10.4 TMU
9) RL1 ; Tn = 2 TMU
b) 3.1 secs
Explanation:
a) Determine the normal times in TMUs for these motion elements
1) R16C ; Tn = 17 TMU
2) G4A ; Tn = 7.3 TMU
3) M10B5 ; Tn = 15.1 TMU
4) RL1 ; Tn = 2 TMU
5) R14B ; Tn = 14.4 TMU
6) G1B ; Tn = 3.5 TMU
7) M8C3 ; Tn = 14.7 TMU
8) P1NSE ; Tn = 10.4 TMU
9) RL1 ; Tn = 2 TMU
b ) Determine the total time for this work element in seconds
first we have to determine the total TMU = ∑ TMU = 86.4 TMU
note ; 1 TMU = 0.036 seconds
hence the total time for the work in seconds = 86.4 * 0.036 = 3.1 seconds