Answer:
www stands for world wide web
Explanation:
It will really help you thank you.
Answer:
a. Rotational speed of the drill = 375.96 rev/min
b. Feed rate = 75 mm/min
c. Approach allowance = 3.815 mm
d. Cutting time = 0.67 minutes
e. Metal removal rate after the drill bit reaches full diameter. = 9525 mm³/min
Explanation:
Here we have
a. N = v/(πD) = 15/(0.0127·π) = 375.96 rev/min
b. Feed rate = fr = Nf = 375.96 × 0.2 = 75 mm/min
c. Approach allowance = tan 118/2 = (12.7/2)/tan 118/2 = 3.815 mm
d. Approach allowance T∞ =L/fr = 50/75 = 0.67 minutes
e. R = 0.25πD²fr = 9525 mm³/min.
Answer:
When a pilot pushes the top of the right pedal, it activates the brakes on the right main wheel/wheels, and when the pilot pushes the top of the left rudder pedal, it activates the brake on the left main wheel/wheels. The brakes work in a rather simple way: they convert the kinetic energy of motion into heat energy.
Answer:
Procurement Process
Explanation:
Procurement Process describes the series of activities that an organization partakes in to get products or services in order to achieve their goals. The choice of the procurement process is very important for the success of a construction project.
So during a bidding process, the procurement process is section where the organization will need to get water and other utilities, sanitation equipment or storage needed for the success of a construction project.