Answer:
Magnitude of vector A = 0.904
Explanation:
Vector A , which is directed along an x axis, that is

Vector B , which has a magnitude of 5.5 m


The sum is a third vector that is directed along the y axis, with a magnitude that is 6.0 times that of vector A 
Comparing we will get

Substituting in 

So we have

Magnitude of vector A = 0.904
The speed of tsunami is a.0.32 km.
Steps involved :
The equation s = 356d models the maximum speed that a tsunami can move at. It reads as follows: s = 200 km/h d =?
Let's now change s to s in the equation to determine d: s = 356√d 200 = 356√d √d = 200 ÷ 356 √d = 0.562 Let's square the equation now by squaring both sides: (√d)² = (0.562) ² d = (0.562)² = 0.316 ≈ 0.32
As a result, 0.32 km is roughly the depth (d) of water for a tsunami moving at 200 km/h.
To learn more about tsunami refer : brainly.com/question/11687903
#SPJ4
E = <u>kQ</u><u> </u><u> </u><u> </u><u> </u><u> </u><u> </u>
(r + h)²
where,
k = 9 × 10^9Nm²C^-2
Q = total charge, 300uC = 300 × 10^ -6C
r = 8 × 10^ -2m
h = 16 × 10^ -2m
then,
E = <u>9</u><u>e</u><u>9</u><u> </u><u>*</u><u> </u><u>3</u><u>0</u><u>0</u><u>e</u><u>^</u><u>-</u><u>6</u><u> </u><u> </u><u> </u><u> </u>
(8e^-2 + 16e^-2)²
E = 4687500N/C
The amount of power change if less work is done in more time"then the amount of power will decrease".
<u>Option: B</u>
<u>Explanation:</u>
The rate of performing any work or activity by transferring amount of energy per unit time is understood as power. The unit of power is watt
Here this equation showcase that power is directly proportional to the work but dependent upon time as time is inversely proportional to the power i.e as time increases power decreases and vice versa.
This can be understood from an instance, on moving a load up a flight of stairs, the similar amount of work is done, no matter how heavy but when the work is done in a shorter period of time more power is required.
Answer:
Explanation:
Has an acceleration directed towards center of its path