1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Anna [14]
2 years ago
12

What is the relationship between permanent modular construction (PMC) and purpose-built construction?

Engineering
1 answer:
pishuonlain [190]2 years ago
5 0

Permanent modular construction tends to fit the construction purposes that it was specifically designed for.

You might be interested in
Of the cost reduction strategies for workers' compensation mentioned in the required readings, which one do you think would work
Vesnalui [34]

In industries together with production, we want people to address the manufacturing of merchandise and the usage of heavy machinery.

<h3>What is the painting situation?</h3>

In such painting situations, people are at risk of injuries, and this prices the maximum for the company. So so that you can put into effect value discount is such conditions we want to have right coincidence cowl plans for the people and make sure all of the protection precautions are taken withinside the factory.

  1. The people have to be properly educated on using protection measures and in case any injuries arise we have to have coverage claims in order that we not want to make investments extra cash and we also can offer protection and protection to the people.
  2. This approach is excellent for this enterprise due to the fact regardless of what number of precautions we take people are uncovered to fitness risks and as a result having the right coverage insurance is a superb value discount strategy.

Read more bout the compensation :

brainly.com/question/25273589

#SPJ1

3 0
1 year ago
failure to yield the right-of-way to another vehicle or pedestrian is the primary Collision factor in about 20% of fatal and inj
laila [671]

You could just create a turn on green arrow. Have a button for pedestrians. The only way for them to turn is if they have a green arrow and the green arrow will only appear when pedestrians are stopped or finished walking and all cars are clear or fully stopped

8 0
3 years ago
Which system of linear inequalities is represented by the graph? y &gt; x – 2 and y x + 1 y x + 1 y &gt; x – 2 and y &lt; x + 1
KatRina [158]

Answer:

The graph representing the linear inequalities is attached below.

Explanation:

The inequalities given are :

y>x-2   and y<x+1

For tables for values of x and y and get coordinates to plot for both equation.

In the first equation;

y>x-2

y=x-2

y-x = -2

The table will be :

x    y

-2  -4

-1    -3

0     -2

1      -1

2      0

The coordinates to plot are : (-2,-4) , (-1,-3), (0,-2), (1,-1) ,(2,0)

Use a dotted line and shade the part right hand side of the line.

Do the same for the second inequality equation and plot then shade the part satisfying the inequality.

The graph attached shows results.

5 0
3 years ago
Read 2 more answers
The second programming project involves writing a program that accepts an arithmetic expression of unsigned integers in postfix
Tpy6a [65]

Answer:

Explanation:

Note: In case of any queries, just comment in box I would be very happy to assist all your queries

SourceCode:

// MyGUI.java:

// Import packages

import java.awt.FlowLayout;

import java.awt.GridLayout;

import java.awt.event.ActionEvent;

import java.awt.event.ActionListener;

import java.io.BufferedReader;

import java.io.IOException;

import java.io.InputStreamReader;

import java.util.EmptyStackException;

import java.util.Stack;

import javax.swing.JButton;

import javax.swing.JFrame;

import javax.swing.JLabel;

import javax.swing.JOptionPane;

import javax.swing.JPanel;

import javax.swing.JTextField;

import javax.swing.SwingConstants;

// Declaare and define the class MyGUI

abstract class MyGUI extends JFrame implements ActionListener {

JTextField userInput;

JLabel inputDescLbl, resultLbl;

JPanel inputPanel, resultPanel;

JButton evlBtn;

Stack<Object> stk;

// Define the constructor MyGUI

MyGUI() {

super("Tree Address Generator");

inputPanel = new JPanel(new FlowLayout());

resultPanel = new JPanel(new FlowLayout());

setLayout(new GridLayout(2, 1));

userInput = new JTextField(20);

inputDescLbl = new JLabel("Enter Postfix Expression:");

evlBtn = new JButton("Construct Tree");

evlBtn.addActionListener(this);

resultLbl = new JLabel("Infix Expression:", SwingConstants.LEFT);

add(inputPanel);

add(resultPanel);

inputPanel.add(inputDescLbl);

inputPanel.add(userInput);

inputPanel.add(evlBtn);

resultPanel.add(resultLbl);

stk = new Stack<Object>();

}

}

//Stack.java:

// Declare and define the class Stack

class Stack {

private int[] a;

private int top, m;

public Stack(int max) {

m = max;

a = new int[m];

top = -1; }

public void push(int key) {

a[++top] = key; }

public int pop() {

return (a[top--]); }

}

// Declare and define the class Evaluation()

class Evaluation {

public int calculate(String s) {

int n, r = 0;

n = s.length();

Stack a = new Stack(n);

for (int i = 0; i < n; i++) {

char ch = s.charAt(i);

if (ch >= '0' && ch <= '9')

a.push((int) (ch - '0'));

else if (ch == ' ')

continue;

else {

int x = a.pop();

int y = a.pop();

switch (ch) {

case '+':

r = x + y;

break;

case '-':

r = y - x;

break;

case '*':

r = x * y;

break;

case '/':

r = y / x;

break;

default:

r = 0;

}

a.push(r);

}

}

r = a.pop();

return (r);

}

}

// PostfixToInfix.java:

// Import packages

import java.util.Scanner;

import java.util.Stack;

// Declare and define the class PostfixToInfix

class PostfixToInfix {

// Determine whether the character entered is an operator or not

private boolean isOperator(char c) {

if (c == '+' || c == '-' || c == '*' || c == '/' || c == '^')

return true;

return false;

}

// Declare and define the convert()

public String convert(String postfix) {

Stack<String> s = new Stack<>();

for (int i = 0; i < postfix.length(); i++) {

char c = postfix.charAt(i);

if (isOperator(c)) {

String b = s.pop();

String a = s.pop();

s.push("(" + a + c + b + ")");

} else

s.push("" + c);

}

return s.pop();

}

// Program starts from main()

public static void main(String[] args) {

PostfixToInfix obj = new PostfixToInfix();

Scanner sc = new Scanner(System.in);

// Prompt the user to enter the postfix expression

System.out.print("Postfix : ");

String postfix = sc.next();

// Display the expression in infix expression

System.out.println("Infix : " + obj.convert(postfix));

}

}

Output:

e Console X terminated PostfixTolnfix [Java Application] C:\Program Files\Java\jrel.8.0_121\bin\javaw.exe Postfix : ABD++C-D/ .

3 0
3 years ago
¿Cuál de los siguientes factores reduciría el riesgo de roturas por un choque térmico a. Alto coeficiente de dilatación térmico
hoa [83]

Answer:

c. Alto módulo de elasticidad

Explanation:

The correct answer to the given question is c. Alto modulo de elasticidad

A Youngs modulus measures the resistance of any material to elastic deformation. It is basically the ratio of the stress applied to a body to the results of the stress which is the response of the body over the pressure applied. This is to test the stiffness of any material and most of time the material stays constant over stressing.

5 0
2 years ago
Other questions:
  • Consider a cubical furnace with a side length of 3 m. The top surface is maintained at 700 K. The base surface has emissivity of
    13·1 answer
  • A square loop of wire surrounds a solenoid. The side of the square is 0.1 m, while the radius of the solenoid is 0.025 m. The sq
    6·1 answer
  • A completely mixed activated-sludge process is being designed for a wastewater flow of 10,000 m3/d (2.64 mgd) using the kinetics
    6·1 answer
  • Using the idea of mass and change of speed... could a bowling ball be thrown so fast that it has the same force as a car driving
    7·1 answer
  • If block A of the pulley system is moving downward at 6 ft&gt;s while block C is moving down at 18 ft&gt;s, determine the relati
    10·1 answer
  • What are the four causes of electrical faults?
    5·1 answer
  • The concrete canoe team does some analysis on their design and calculates that they need a compressive strength of 860 psi. They
    15·1 answer
  • Suggest appropriate materials for a cylinder head and give four reason for your choice​
    5·1 answer
  • Running ropes must be taken out of service if they have _____ broken wires in one strad in one lay
    15·2 answers
  • Can someone please help!
    8·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!