1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
OverLord2011 [107]
3 years ago
14

Who can use NIST resources?

Engineering
1 answer:
sukhopar [10]3 years ago
7 0

Answer:

Federal agencies

Explanation:

NIST (National Institute of Standards and Technology) also called between 1901 and 1988 National Bureau of Standards (NBS), it is an agency of the Technology Administration of the United States Department of Commerce. The mission of this institute is to promote innovation and industrial competition in the United States through advances in metrology, standards and technology in ways that improve economic stability and quality of life.

As part of this mission, NIST scientists and engineers continually refine the science of measurement (metrology) by creating precise engineering and manufacturing required for most current technological advances. They are also directly involved in the development and testing of standards made by the private sector and government agencies. The NIST was originally called the National Bureau of Standards (NBS), a name it had from 1901 to 1988. The progress and technological innovation of the United States depends on the abilities of the NIST, especially if we talk about four areas: biotechnology , nanotechnology, information technologies and advanced manufacturing.

You might be interested in
0 - 1"<br> -20<br> -15<br> -10<br> 5<br> 0 1 2 3<br> 0
faust18 [17]

Answer:

#WeirdestQuestionOfAllTime

Explanation:

8 0
3 years ago
A pitfall cited in Section 1.10 is expecting to improve the overall performance of a computer by improving only one aspect of th
Oxana [17]

Answer:

a) For this case the new time to run the FP operation would be reduced 20% so that means 100-20% =80% from the original time

(1-0.2)*70 s =56s

The reduction on this case is 70-56 s=14s

And since the new total time would be given by 250-14=236 s

b) For this case the total time is reduced 20%  so that means that the new total time would be (1-0.2)=0.8 times the original total time (1-0.2) *250s =200 s

The original time for INT operations is calculated as:

250 = 70+85+40 +t_{INT}

t_{INT}=55s

For this part the only time that was changed is assumed the INT operations so then:

200 = 70+85+40 \Delta t_{INT}

And then: \Delta t_{INT}= 200-70-85-40=5 s

c) A reduction of the total time implies that the total time would be 205 s from the results above. And the time for FP is 70, for L/S is 85 and for INT operations is 55 s, so then if we add 70+85+55=210s, we see that 210>205 so then we cannot reduce the total time 20% just reducing the branch intructions.

Explanation:

From the info given we know that a computer running a program that requires 250 s, with 70 s spent executing FP instructions, 85 s executed L/S instructions and 40 s spent executing branch instructions.

Part 1

For this case the new time to run the FP operation would be reduced 20% so that means 100-20% =80% from the original time

(1-0.2)*70 s =56s

The reduction on this case is 70-56 s=14s

And since the new total time would be given by 250-14=236 s

Part 2

For this case the total time is reduced 20%  so that means that the new total time would be (1-0.2)=0.8 times the original total time (1-0.2) *250s =200 s

The original time for INT operations is calculated as:

250 = 70+85+40 +t_{INT}

t_{INT}=55s

For this part the only time that was changed is assumed the INT operations so then:

200 = 70+85+40 \Delta t_{INT}

And then: \Delta t_{INT}= 200-70-85-40=5 s

And we can quantify the decrease using the relative change:

\% Change = \frac{5s}{55 s} *100 = 9.09\% of reduction

Part 3

A reduction of the total time implies that the total time would be 205 s from the results above. And the time for FP is 70, for L/S is 85 and for INT operations is 55 s, so then if we add 70+85+55=210s, we see that 210>205 so then we cannot reduce the total time 20% just reducing the branch intructions.

8 0
3 years ago
Pls help me it’s due today
hichkok12 [17]

Answer:

C. 14.55

Explanation:

12 x 10 = 120

120 divded by 10 is 12

so now we do the left side

7 x 3 = 21 divded by 10 is 2

so now we have 14

and the remaning area is 0.55

so 14.55

6 0
3 years ago
QUESTION 6
Aloiza [94]
It would be 2 Portfolio
3 0
3 years ago
Who plays blox burg???
xeze [42]

Answer:

I don't have robux

Explanation:

but i love adopt me

7 0
3 years ago
Read 2 more answers
Other questions:
  • Compare automation and autonomous
    12·1 answer
  • Two gases—neon and air—are expanded from P1 to P2 in a closed-system polytropic process with n = 1.2. _____ produces more work w
    7·1 answer
  • Why are open systems harder to study than closed systems?​
    6·1 answer
  • The outer surface temperature of a glass filled with iced water may drop below the dew-point temperature of the surrounding air,
    5·1 answer
  • Whats the best used for Arch bridge
    11·1 answer
  • When diagnosing engine noise, Technician A says a mechanical stethoscope may not be appropriate in pinpointing a squeaking drive
    14·1 answer
  • If you owned a business, what are some of the ways you could follow green computing recommendations with regards to recycling an
    13·1 answer
  • Automobile engines normally have
    8·1 answer
  • What is one of the most common ways in which workers get hurt around machines?
    14·1 answer
  • soy nueva en esto me pudieran ayudar nadie me ayuda soy de peru y no endiendo nada de lo que me dicen alguie me puediera explica
    10·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!