Answer:
2.12/R mW
Explanation:
The electrical power, P generated by the rod is
P = B²L²v²/R where B = magnetic field = 0.575 T, L = length of metal rod = separation of metal rails = 20 cm = 0.2 m, v = velocity of metal rod = 40 cm/s = 0.4 m/s and R = resistance of rod = ?
So, the induced emf on the conductor is
E = BLv
= 0.575 T × 0.2 m × 0.4 m/s
= 0.046 V
= 46 mV
The electrical power, P generated by the rod is
P = B²L²v²/R
= B²L²v²/R
So, P = (0.575 T)² × (0.2 m)² × (0.4 m/s)²
= 0.002116/R W
= 2.12/R mW
<span>Which group in the periodic table is known as salt formers?
The correct option is the last one: Halogen family.
</span><span>
You can find the halogen or "</span>salt formers" in the group 17 of the periodic table. These are:
- Fluorine.
-Chlorine.
- Bromine.
- Iodine.
- Astatine.
All of them are non-metallic elements and they have 7 electrons.
Answer:
A. the left half becomes neutral while the right half remains negatively charged
Explanation:
This is because wherever light strikes the photoconductor, it transforms from an insulator into a conductor. The charge will then migrate through it and leaves its surface. By exposing the left half of the photoconductor to light, you allow its local charge to leave and it becomes neutral.
Answer:
Usually, a solution can have several criteria and constraints. Even though all are important, some criteria are more important than others. The same holds true for constraints. But what do you do if it's impossible for a solution to cover every criterion while avoiding every constraint? In cases like this, you can use prioritization. Listing criteria and constraints based on priority shows the relative importance of each. You will need to prioritize the criteria and constraints for each sub-problem so that you can design a solution for each one individually. Prioritization can help you compare two different possible solutions. For example, the criterion that cars travel at 15 mph through the neighborhood might be a higher priority than the constraint that homeowners are only willing to spend $10,000 on this issue. If this is the case, you would want to generate solutions that also follow the priority in mind. All criteria are important, but engineers must sometimes make a trade-off, which is a compromise or change in one or more criteria or constraints so that they can be met at the same time. This is where prioritization comes in handy as it helps determine the trade-offs. A solution that is doing a better job of meeting one criterion may result in not completely meeting another criterion. Prioritization will help you choose which solution to go with.
Explanation:
I got this from quizlet :)
Explanation:
Make a table, listing the x and y coordinates of each square's center of gravity and its mass. Multiply the coordinates by the mass, add the results for each x and y, then divide by the total mass.

The x-coordinate of the center of gravity is 15/14 a.
The y-coordinate of the center of gravity is 47/42 a.