Answer:
The correct answer will be "400.4 N". The further explanation is given below.
Explanation:
The given values are:
Mass of truck,
m = 600 kg
g = 9.8 m/s²
On equating torques at the point O,
⇒
So that,
On putting the values, we get
⇒ 
⇒ 
Answer:
ik the answer but I'm busy rn
Answer:
Not knowing the units the tolerance is 0.02. I would presume mm but hopefully your question has more detail.
Explanation:
The tolerance is the portion after the main dimension (+/- 0.02). In our case we have bilateral tolerance since there is tolerance in both directions (positive and negative). If you were building a part the acceptable range would be 2.98 to 3.02 based on the tolerance provided.
Answer:
Gravitational Potential =58.914 KJ
Explanation:
We know that

Given mass = 251 kg
Height= 24 m
g is acceleration due to gravity = 
Applying values in the equation we get



Answer:
33.56 ft^3/sec.in
Explanation:
Duration = 6 hours
drainage area = 185 mi^2
constant baseflow = 550 cfs
<u>Derive the unit hydrograph using the inverse procedure </u>
first step : calculate for the volume of direct runoff hydrograph using the details in table 2 attached below
Vdrh = sum of drh * duration
= 29700 * 6 hours ( 216000 secs )
= 641,520,000 ft^3.
next step : Calculate the volume of runoff in equivalent depth
Vdrh / Area = 641,520,000 / 185 mi^2
= 1.49 in
Finally derive the unit hydrograph
Unit of hydrograph = drh / volume of runoff in equivalent depth
= 50 ft^3 / 1.49 in = 33.56 ft^3/sec.in