A is correct......
please vote my answer brainliest. thanks!
The answer is A: to relax & meditate
Answer:
Work done required is 3567.2 J
Explanation:
Given :
Length of chain, l = 72 m
Mass of chain, M = 29 kg
Linear mass density of chain, μ =
=
= 0.40 kg/m
Let x be the length of the chain which lift to the top of the building.
Work done required to lift the chain is equal to the potential energy of the chain.
W = ∫μg (72 - x ) dx
Here g is acceleration due to gravity.
The limit of integration is from 0 to 14.
W = μg ( 72x - x²/2)
Substitute 0.40 kg/m for μ, 9.8 m/s² for g and 14 m for x in the above equation.
W = 
W = 3567.2 J
A manufacturer of printed circuit boards has a design
capacity of 1,000 boards per day. the effective capacity, however, is 700
boards per day. recently the production facility has been producing 950 boards
per day. The design capacity utilization is (950/100) *100 = 95 %
Because frame of reference decides are your forces positive or negative. It is important for the direction of motion.