Answer:
Therefore the rate of corrosion 37.4 mpy and 0.952 mm/yr.
Explanation:
The corrosion rate is the rate of material remove.The formula for calculating CPR or corrosion penetration rate is

K= constant depends on the system of units used.
W= weight =485 g
D= density =7.9 g/cm³
A = exposed specimen area =100 in² =6.452 cm²
K=534 to give CPR in mpy
K=87.6 to give CPR in mm/yr
mpy


=37.4mpy
mm/yr


=0.952 mm/yr
Therefore the rate of corrosion 37.4 mpy and 0.952 mm/yr.
my hypothesis is that If you drop a piece of buttered toast, it will land butter side down.
I tested it by dropping 10 pieces of buttered toast off the table and noted on which side it landed
It could be falsified cause I just made all of this up. In essence, it's like flipping a coin, 50/50 chance so I could say that 5 landed butter up and 5 landed butter down.
Answer:
I am fairly certain the answer is 2m/s^2
Explanation: